2023 VinFast VF9 EcoFACTORY OEM SERVICE PROCEDURE

ASU Gateway Module Bracket Removal And Installation/Replacement

Mobile Repair Possible:  No

Overview: 

G16025104Courtesy of VINFAST, LLC

Removal Procedure: 

  1. Disconnect the 12V battery negative terminal. Refer to 12V BATTERY NEGATIVE CABLE DISCONNECTION/CONNECTION
  2. Remove C-Pillar lower trim panel on passenger side. Refer to C-PILLAR LOWER TRIM PANEL REMOVAL AND INSTALLATION/REPLACEMENT
    G16025105Courtesy of VINFAST, LLC
  3. Unlock and disconnect the electrical connector (1).
  4. Remove 3 nuts (2).

    Torque: 5 Nm 

  5. Remove the ASU Gateway module bracket (3).

Replacement Procedure: 

  1. Rebuild the ASU gateway module. Refer to ASU GATEWAY MODULE REMOVAL AND INSTALLATION/REPLACEMENT 

Installation Procedure: 

  1. Installation is the reverse of removal procedure, noting the following.

    All fasteners must be tightened to torque specification! 

  2. Install C-Pillar lower trim panel on passenger side. Refer to C-PILLAR LOWER TRIM PANEL REMOVAL AND INSTALLATION/REPLACEMENT
  3. Reconnect the 12V battery negative terminal. Refer to 12V BATTERY NEGATIVE CABLE DISCONNECTION/CONNECTION
Chapter Navigation
Factory Service Tools

Use the Manual With the Right Hardware

Pair factory procedures with proven DIY tools so the instructions are easier to execute.

Disclosure: Verified tool recommendations may earn an affiliate commission at no cost to you.

When to See a Mechanic

Stop DIY work and contact a certified mechanic immediately if any of the following apply:

  • • You smell fuel, burning insulation, or see smoke.
  • • Brakes feel soft, pull hard to one side, or make grinding noises.
  • • The engine overheats, stalls repeatedly, or misfires under load.
  • • You are missing required tools, torque specs, or safe lifting equipment.
  • • You are not confident in the next step or safety outcome.