2023 VinFast VF9 EcoFACTORY OEM SERVICE PROCEDURE

ASU Gateway Module Removal And Installation/Replacement

Mobile Repair Possible:  No

Overview: 

Fig 1: ASU Gateway Module Components Location
G16025106Courtesy of VINFAST, LLC

Removal Procedure: 

  1. Disconnect the 12V battery negative terminal. Refer to 12V BATTERY NEGATIVE CABLE DISCONNECTION/CONNECTION
  2. Remove C-Pillar lower trim panel on passenger side. Refer to C-PILLAR LOWER TRIM PANEL REMOVAL AND INSTALLATION/REPLACEMENT
    G16025107Courtesy of VINFAST, LLC
  3. Unlock and disconnect the electrical connector (1).
  4. Remove 4 nuts (2).

    Torque: 8 Nm 

  5. Remove the ASU Gateway module (3).

Installation Procedure: 

  1. Installation is the reverse of removal procedure, noting the following.

    All fasteners must be tightened to torque specification! 

  2. Install C-Pillar lower trim panel on passenger side. Refer to C-PILLAR LOWER TRIM PANEL REMOVAL AND INSTALLATION/REPLACEMENT
  3. Reconnect the 12V battery negative terminal. Refer to 12V BATTERY NEGATIVE CABLE DISCONNECTION/CONNECTION
  4. Diagnostics, Programming and Setup. Refer to DIAGNOSTICS, PROGRAMMING AND SETUP USING SCAN TOOL IN SERVICE
Chapter Navigation
Factory Service Tools

Use the Manual With the Right Hardware

Pair factory procedures with proven DIY tools so the instructions are easier to execute.

Disclosure: Verified tool recommendations may earn an affiliate commission at no cost to you.

When to See a Mechanic

Stop DIY work and contact a certified mechanic immediately if any of the following apply:

  • • You smell fuel, burning insulation, or see smoke.
  • • Brakes feel soft, pull hard to one side, or make grinding noises.
  • • The engine overheats, stalls repeatedly, or misfires under load.
  • • You are missing required tools, torque specs, or safe lifting equipment.
  • • You are not confident in the next step or safety outcome.