2021 Toyota Mirai XLEFACTORY OEM SERVICE PROCEDURE

Reassembly [11/2020 - ]: Procedure

  1. INSTALL HIGH VOLTAGE FUSE 
    GTY993405Courtesy of © TOYOTA, LICENSE AGREEMENT TMS1002
    HINT: 
    Perform this procedure only when replacement of the high voltage fuse is necessary.
    1. Fig 1: 2 High Voltage Fuses Tightening Sequence
      GTY1166205Courtesy of © TOYOTA, LICENSE AGREEMENT TMS1002
      1. Using a T20 "TORX" socket wrench, temporarily install the 2 high voltage fuses with the 4 bolts.
      2. Tighten the 4 bolts in the order shown in the illustration.

        Torque: 4.5 N.m (46 kgf/cm, 40 in.lbf) 

  2. INSTALL AIR CONDITIONING COMPRESSOR CABLE 
    1. Fig 2: Air Conditioning Compressor Cable Tightening Sequence
      GTY1160766Courtesy of © TOYOTA, LICENSE AGREEMENT TMS1002
      1. Temporarily install the air conditioning compressor cable with the 4 bolts.
      2. Tighten the 4 bolts in the order shown in the illustration.

        Torque: 6.0 N.m (61 kgf/cm, 53 in.lbf) 

  3. INSTALL FC INVERTER INPUT TERMINAL 
    1. Fig 3: FC Inverter Input Terminal Tightening Sequence
      GTY1163680Courtesy of © TOYOTA, LICENSE AGREEMENT TMS1002
      1. Temporarily install the FC inverter input terminal with the 5 bolts.

        HINT: 

        Install the harness as shown in the illustration.

      2. Tighten the 5 bolts in the order shown in the illustration.

        Torque: 5.0 N.m (51 kgf/cm, 44 in.lbf) 

  4. INSTALL FC WATER AND HYDROGEN PUMP INVERTER TERMINAL 
    1. Fig 4: FC Water And Hydrogen Pump Inverter Terminal Tightening Sequence
      GTY1163613Courtesy of © TOYOTA, LICENSE AGREEMENT TMS1002
      1. Temporarily install the FC water and hydrogen pump inverter terminal with the 2 bolts.
      2. Tighten the 2 bolts in the order shown in the illustration.

        Torque: 4.5 N.m (46 kgf/cm, 40 in.lbf) 

  5. INSTALL FC COOLING WATER PUMP INVERTER ASSEMBLY AND FC HYDROGEN PUMP INVERTER ASSEMBLY 
    1. Fig 5: FC Cooling Water Pump Inverter Assembly And FC Hydrogen Pump Inverter Assembly Tightening Sequence
      GTY1160750Courtesy of © TOYOTA, LICENSE AGREEMENT TMS1002
      *a Apply grease here *b Do not apply grease here
      Bolt A Bolt B
      THERMAL GREASE X-23-7887-4 - -
      1. Clean grease from the FC cooling water pump inverter assembly and FC hydrogen pump inverter assembly installation areas on the FC converter case sub-assembly.
        NOTE:

        Clean and degrease the installation surface using non-residue solvent and brake cleaner.

      2. Apply Toyota genuine thermal grease X-23-7887-4 to a new FC cooling water pump inverter assembly and new FC hydrogen pump inverter assembly, and set them to the FC converter case sub-assembly.
        NOTE:
        • Do not allow grease on the 4 bus bar locations and 6 installation seat locations on the FC cooling water pump inverter assembly and FC hydrogen pump inverter assembly.
        • Do not allow heat dissipating grease on other parts, etc. before seating the FC converter case sub-assembly.
        • Do not reuse the FC cooling water pump inverter assembly and FC hydrogen pump inverter assembly.
      3. Temporarily install the FC cooling water pump inverter assembly and FC hydrogen pump inverter assembly with the 10 bolts.
        Item Length
        A 16 mm (0.630 in.)
        B 12 mm (0.472 in.)
      4. Tighten the 10 bolts in the order shown in the illustration.

        for bolt A 

        Torque: 5.0 N.m (51 kgf/cm, 44 in.lbf) 

        for bolt B 

        Torque: 6.5 N.m (66 kgf/cm, 58 in.lbf) 

  6. INSTALL FC INVERTER INPUT JUNCTION COVER 
    1. Fig 6: FC Inverter Input Junction Cover Tightening Sequence
      GTY1166210Courtesy of © TOYOTA, LICENSE AGREEMENT TMS1002
      *a Seal Packing Diameter: 2.0 to 3.5 mm (0.0787 to 0.138 in.)
      Seal Packing Diameter: 2.0 to 6.5 mm (0.0787 to 0.256 in.) (Start/End Point Only)
      *b Groove Width: 4.0 mm (0.157 in.)
      *c Groove Width: 6.1 to 6.5 mm (0.240 to 0.256 in.) - -
      Bolt A Bolt B
      1. Before applying seal packing, cleanly remove any old sealant sticking to the part to be sealed.
      2. Apply seal packing black to the areas shown in the illustration.
        NOTE:
        • Check and clean bolts and bolt holes.
        • Clean and degrease the installation surface using non-residue solvent and brake cleaner.
        • Install the part within 3 minutes and finish all tightening within 15 minutes after applying seal packing.
      3. Temporarily install the FC inverter input junction cover with the 9 bolts labeled A.
        Item Length
        A 16 mm (0.630 in.)
      4. Tighten the 9 bolts labeled A in the order shown in the illustration.

        for bolt A 

        Torque: 6.0 N.m (61 kgf/cm, 53 in.lbf) 

      5. Install the 2 bolts labeled B in the order shown in the illustration.

        for bolt B 

        Torque: 8.0 N.m (82 kgf/cm, 71 in.lbf) 

        Item Length
        B 12 mm (0.472 in.)
  7. INSTALL REAR FC CONVERTER SERVICE HOLE COVER 
    1. Fig 7: Rear FC Converter Service Hole Cover Tightening Sequence
      GTY1161120Courtesy of © TOYOTA, LICENSE AGREEMENT TMS1002
      *a Seal Packing Diameter: 2.0 to 3.5 mm (0.0787 to 0.138 in.)
      Seal Packing Diameter: 2.0 to 6.5 mm (0.0787 to 0.256 in.) (Start/End Point Only)
      - -
      1. Before applying seal packing, cleanly remove any old sealant sticking to the part to be sealed.
      2. Apply seal packing black to the areas shown in the illustration.
        NOTE:
        • Check and clean bolts and bolt holes.
        • Clean and degrease the installation surface using non-residue solvent and brake cleaner.
        • Install the part within 3 minutes and finish all tightening within 15 minutes after applying seal packing.
      3. Install a new rear FC converter service hole cover with the 2 bolts in the order shown in the illustration.

        Torque: 4.5 N.m (46 kgf/cm, 40 in.lbf) 

  8. INSTALL FC CONVERTER POWER OUTLET TERMINAL SUB-ASSEMBLY 
    1. Fig 8: FC Converter Power Outlet Terminal Sub-Assembly Tightening Sequence
      GTY1166854Courtesy of © TOYOTA, LICENSE AGREEMENT TMS1002
      1. Temporarily install the FC converter power outlet terminal sub-assembly with the 2 bolts.
      2. Tighten the 2 bolts in the order shown in the illustration.

        Torque: 4.5 N.m (46 kgf/cm, 40 in.lbf) 

  9. INSTALL NO. 2 FC CONVERTER WIRE 
    1. GTY1167445Courtesy of © TOYOTA, LICENSE AGREEMENT TMS1002
  10. INSTALL FC CONVERTER POWER MODULE TRANSISTOR (IPM) 
    1. GTY1167442Courtesy of © TOYOTA, LICENSE AGREEMENT TMS1002
  11. INSTALL FC CONVERTER CURRENT SENSOR 
    1. GTY1167441Courtesy of © TOYOTA, LICENSE AGREEMENT TMS1002

      Torque: 4.5 N.m (46 kgf/cm, 40 in.lbf) 

  12. INSTALL FCDC CONVERTER CONTROL ECU BOARD SUB-ASSEMBLY 
    1. Fig 9: FCDC Converter Control ECU Board Sub-Assembly Tightening Sequence
      GTY1165556Courtesy of © TOYOTA, LICENSE AGREEMENT TMS1002
      *1 Low Voltage Connector *2 ECU Wire Sub-assembly
      *3 NO. 3 FC Converter Wire - -
      *a FC converter sheet hole *b Connector Hole
      *c Knock Pin *d Pin Hole
      1. Using the magnetic screwdriver of the FC converter power module transistor kit, install a new FCDC converter control ECU board sub-assembly with the 9 screws in the order shown in the illustration.

        Torque: 2.5 N.m (25 kgf/cm, 22 in.lbf) 

        NOTE:

        Do not drop screws on the FCDC converter control ECU board sub-assembly.

      2. Connect the 2 connectors and install the 2 new ECU wire sub-assemblies.
      3. Insert and position the low voltage connector in the hole on the FC converter sheet as shown in the illustration.
      4. Remove the peeling paper on a new FC converter sheet while making sure not to touch the adhesional surface.
      5. Attach the new FC converter sheet to the FC converter power module transistor (IPM) as shown in the illustration.
        NOTE:
        • Do not touch the adhesive part of the double-sided tape.
        • Check that there is no foreign matter or other substances that could affect adhesiveness on the double-sided tape application surface.
        • Attach so that the connector holes are not blocked.
        • Do not to apply excessive force to the FCDC converter control ECU board sub-assembly when attaching it.

        HINT: 

        It is recommended to attach in the order shown in the illustration.

      6. Connect the connector and install the No. 3 FC converter wire.
      7. Connect the 5 connectors.
        NOTE:

        Do not apply excessive force to the FCDC converter control ECU board sub-assembly connector.

      8. Align the knock pin on the FC converter power module transistor (IPM) with the pinhole on the case, and set the FC converter power module transistor (IPM).
      9. Install the FC converter power module transistor (IPM) with the 4 new bolts (A) and 4 bolts (B).

        for bolt A 

        Torque: 6.0 N.m (61 kgf/cm, 53 in.lbf) 

        for bolt B 

        Torque: 6.5 N.m (66 kgf/cm, 58 in.lbf) 

        NOTE:
        • Clean the hole for bolt A and the bolt A installation area.
        • Tighten the 8 bolts in the order of (A) and (B).
  13. INSTALL NO. 1 FC CONVERTER WIRE 
    1. GTY1167342Courtesy of © TOYOTA, LICENSE AGREEMENT TMS1002

      Torque: 6.0 N.m (61 kgf/cm, 53 in.lbf) 

  14. CONNECT NO. 1 FC CONVERTER WIRE 
    1. GTY1160878Courtesy of © TOYOTA, LICENSE AGREEMENT TMS1002
  15. INSTALL NO. 1 FC STACK CASE PLUG 
    1. GTY1160993Courtesy of © TOYOTA, LICENSE AGREEMENT TMS1002
      *1 No. 1 FC Stack Case Plug - -
      *a FC Converter Case Sub-assembly Edge *b Check installation area
      1. Remove the peeling paper on a new No. 1 FC stack case plug while making sure not to touch the adhesional surface.
      2. Install the No. 1 FC stack case plug to the FC converter case sub-assembly.
        NOTE:

        Clean and degrease the installation surface of the No. 1 FC stack case plug.

      3. Trace once around the installation area of the No. 1 FC stack case plug and check that it is securely installed.
  16. INSTALL FC CONVERTER SIGNAL CONNECTOR COVER 
    1. Fig 10: FC Converter Signal Connector Cover Tightening Sequence
      GTY1166993Courtesy of © TOYOTA, LICENSE AGREEMENT TMS1002
      *a Seal Packing Diameter: 2.0 to 3.5 mm (0.0787 to 0.138 in.)
      Seal Packing Diameter: 2.0 to 6.5 mm (0.0787 to 0.256 in.) (Start/End Point Only)
      - -
      1. Before applying seal packing, cleanly remove any old sealant sticking to the part to be sealed.
      2. Apply seal packing black to the areas shown in the illustration.
        NOTE:
        • Check and clean bolts and bolt holes.
        • Clean and degrease the installation surface using non-residue solvent and brake cleaner.
        • Install the part within 3 minutes and finish all tightening within 15 minutes after applying seal packing.
      3. Install the FC converter signal connector cover to the FC converter case sub-assembly with the 4 bolts in the order shown in the illustration.

        Torque: 8.0 N.m (82 kgf/cm, 71 in.lbf) 

  17. INSTALL FC CONVERTER COOLING PIPE 
    1. Fig 11: FC Converter Cooling Pipe Tightening Sequence
      GTY1165453Courtesy of © TOYOTA, LICENSE AGREEMENT TMS1002
      1. Install 2 new gaskets to the 2 new FC converter cooling pipes.
        NOTE:

        Do not reuse the FC converter cooling pipe.

      2. Temporarily install the 2 FC converter cooling pipes with the 4 bolts.
      3. Tighten the 4 bolts in the order shown in the illustration.

        Torque: 8.0 N.m (82 kgf/cm, 71 in.lbf) 

  18. LEAK CHECK (INSPECT FOR COOLANT (TOYOTA GENUINE FC STACK COOLANT (Pre-mixed)) LEAK) 
    1. GTY1163143Courtesy of © TOYOTA, LICENSE AGREEMENT TMS1002
      *a Rubber Plug - -
      1. Install the rubber plug at the point shown in the illustration.
      2. Using a vacuum pump, apply a vacuum (50 kPa (375 mmHg, 14.8 in.Hg)).

        Standard

        No decrease in pressure for 30 seconds

        NOTE:

        If the pressure decreases, check carefully for air leaks from the connection between the vacuum pump and coolant pipe. If there are no leaks, remove the FC converter cooling pipe and check the installation condition of the gasket. Also check the O-ring on the FC converter cooling pipe.

  19. INSTALL FC STACK MAIN RELAY 
    1. Fig 12: FC Stack Main Relay Tightening Sequence
      GTY1165407Courtesy of © TOYOTA, LICENSE AGREEMENT TMS1002
      1. Temporarily install the 2 FC stack main relaies with the 4 bolts.
      2. Tighten the 4 bolts in the order shown in the illustration.

        Torque: 4.5 N.m (46 kgf/cm, 40 in.lbf) 

      3. Connect the 2 connectors.
  20. INSTALL FC PRECHARGE JUNCTION ASSEMBLY 
    1. Fig 13: FC Precharge Junction Assembly Tightening Sequence
      GTY1166746Courtesy of © TOYOTA, LICENSE AGREEMENT TMS1002
      1. Temporarily install the FC precharge junction assembly with the 3 bolts.
      2. Tighten the 3 bolts in the order shown in the illustration.

        Torque: 4.5 N.m (46 kgf/cm, 40 in.lbf) 

      3. Connect the connector.
  21. INSTALL NO. 3 FC CONVERTER BUS-BAR PLATE 
    1. GTY1210056Courtesy of © TOYOTA, LICENSE AGREEMENT TMS1002
      1. Install the No. 1 FC converter bus-bar plate with the nut.

        Torque: 8.0 N.m (82 kgf/cm, 71 in.lbf) 

  22. INSTALL NO. 2 FC CONVERTER BUS-BAR PLATE 
    1. Fig 14: No. 2 FC Converter Bus-Bar Plate Tightening Sequence
      GTY1209488Courtesy of © TOYOTA, LICENSE AGREEMENT TMS1002
      1. Temporarily install the No. 2 FC converter bus-bar plate with the 2 nuts.
      2. Tighten the 2 nuts in the order shown in the illustration.

        Torque: 8.0 N.m (82 kgf/cm, 71 in.lbf) 

  23. INSTALL NO. 4 FC CONVERTER BUS-BAR PLATE 
    1. Fig 15: No. 4 FC Converter Bus-Bar Plate Tightening Sequence
      GTY1209605Courtesy of © TOYOTA, LICENSE AGREEMENT TMS1002
      1. Temporarily install the No. 3 FC converter bus-bar plate with the 2 nuts.
      2. Tighten the 2 nuts in the order shown in the illustration.

        Torque: 8.0 N.m (82 kgf/cm, 71 in.lbf) 

  24. INSTALL NO. 6 FC CONVERTER BUS-BAR PLATE 
    1. Fig 16: No. 6 FC Converter Bus-Bar Plate Tightening Sequence
      GTY1209915Courtesy of © TOYOTA, LICENSE AGREEMENT TMS1002
      *1 No. 1 FC Converter Wire - -
      1. Temporarily install the No. 4 FC converter bus-bar plate and No. 1 FC converter wire with the 2 bolts.
      2. Tighten the 2 bolts in the order shown in the illustration.

        Torque: 6.0 N.m (61 kgf/cm, 53 in.lbf) 

  25. INSTALL NO. 5 FC CONVERTER BUS-BAR PLATE 
    1. Fig 17: No. 5 FC Converter Bus-Bar Plate Tightening Sequence
      GTY1210256Courtesy of © TOYOTA, LICENSE AGREEMENT TMS1002
      1. Temporarily install the No. 5 FC converter bus-bar plate with the 2 nuts.
      2. Tighten the 2 nuts in the order shown in the illustration.

        Torque: 8.0 N.m (82 kgf/cm, 71 in.lbf) 

  26. INSTALL NO. 1 FC CONVERTER BUS-BAR PLATE 
    1. Fig 18: No. 1 FC Converter Bus-Bar Plate Tightening Sequence
      GTY1208989Courtesy of © TOYOTA, LICENSE AGREEMENT TMS1002
      *1 No. 1 FC Converter Wire - -
      1. Temporarily install the No. 6 FC converter bus-bar plate and No. 1 FC converter wire with the 2 bolts and nut.
      2. Tighten the 2 bolts and nut in the order shown in the illustration.

        for bolt 

        Torque: 6.0 N.m (61 kgf/cm, 53 in.lbf) 

        for nut 

        Torque: 8.0 N.m (82 kgf/cm, 71 in.lbf) 

  27. INSTALL FC CONVERTER COOLING HOSE 
    1. GTY1162733Courtesy of © TOYOTA, LICENSE AGREEMENT TMS1002
      *1 FC Converter Cooling Hose *2 Hose Clip
      *a Hose Installation Area (2.0 mm (0.0787 in.) or less) *b Hose Clip Installation Area (2.0 to 7.0 mm (0.0787 to 0.276 in.))
      *c Paint Mark (Yellow) *d Paint Mark (White)
      1. Install a new FC converter cooling hose as shown in the illustration.
Factory Service Tools

Use the Manual With the Right Hardware

Pair factory procedures with proven DIY tools so the instructions are easier to execute.

Disclosure: Verified tool recommendations may earn an affiliate commission at no cost to you.

When to See a Mechanic

Stop DIY work and contact a certified mechanic immediately if any of the following apply:

  • • You smell fuel, burning insulation, or see smoke.
  • • Brakes feel soft, pull hard to one side, or make grinding noises.
  • • The engine overheats, stalls repeatedly, or misfires under load.
  • • You are missing required tools, torque specs, or safe lifting equipment.
  • • You are not confident in the next step or safety outcome.