2012 Toyota Venza FWD V6-3.5L (2GR-FE)FACTORY OEM SERVICE PROCEDURE

Connecting Rod, Engine

PISTON SUB-ASSEMBLY WITH CONNECTING ROD

The connecting rod cap bolts are tightened in 2 progressive steps.

Step 1

Install and alternately tighten the bolts of the connecting rod cap in several steps.

Factory service manual diagram





Torque 25 Nm (255 kgf-cm, 18 ft-lbf)

Step 2

Mark the front of each connecting rod cap bolt with paint.

Factory service manual diagram





Retighten the cap bolts 90° as shown in the illustration.

Check the painted mark is now at a 90° angle to the front.

Connecting Rod Side Clearance, Out-of-Round and Diameter


Factory service manual diagram





Connecting Rod Diameter:

Factory service manual diagram





Connecting Rod Bearing Center Wall Thickness:

Factory service manual diagram



Factory Service Tools

Use the Manual With the Right Hardware

Pair factory procedures with proven DIY tools so the instructions are easier to execute.

Disclosure: Verified tool recommendations may earn an affiliate commission at no cost to you.

When to See a Mechanic

Stop DIY work and contact a certified mechanic immediately if any of the following apply:

  • β€’ You smell fuel, burning insulation, or see smoke.
  • β€’ Brakes feel soft, pull hard to one side, or make grinding noises.
  • β€’ The engine overheats, stalls repeatedly, or misfires under load.
  • β€’ You are missing required tools, torque specs, or safe lifting equipment.
  • β€’ You are not confident in the next step or safety outcome.

Rather have a pro handle this?

A certified mobile mechanic comes to your home or office. They bring the tools, you stay comfortable. No tow truck, no waiting room, no surprises.

Comes to youSame-day available12-month warranty
Get a Free Quote

No obligation. See pricing before you book.