2011 Toyota Matrix Base, StandardFACTORY OEM SERVICE PROCEDURE

PCV Valve: Removal: Removal

  1. REMOVE INTAKE MANIFOLD 

    Refer to REMOVAL

  2. REMOVE VENTILATION VALVE SUB-ASSEMBLY 

    HINT: 

    The ventilation valve sub-assembly is the PCV valve.

    1. Using a ball joint lock nut wrench (22 mm), remove the ventilation valve sub-assembly.
      Fig 1: Remove/Install Ventilation Valve Sub-Assembly
      GTY185839Courtesy of © TOYOTA, LICENSE AGREEMENT TMS1002
Chapter Navigation
Factory Service Tools

Use the Manual With the Right Hardware

Pair factory procedures with proven DIY tools so the instructions are easier to execute.

Disclosure: Verified tool recommendations may earn an affiliate commission at no cost to you.

When to See a Mechanic

Stop DIY work and contact a certified mechanic immediately if any of the following apply:

  • • You smell fuel, burning insulation, or see smoke.
  • • Brakes feel soft, pull hard to one side, or make grinding noises.
  • • The engine overheats, stalls repeatedly, or misfires under load.
  • • You are missing required tools, torque specs, or safe lifting equipment.
  • • You are not confident in the next step or safety outcome.