2009 Toyota Matrix Base, AutomaticFACTORY OEM SERVICE PROCEDURE

Charging System (2ZR-FE): Generator: Installation

  1. INSTALL GENERATOR ASSEMBLY 
    1. Install the wire harness clamp bracket with the bolt.

      Torque: 8.4 N*m (86 kgf*cm, 74 in.*lbf) 

      Fig 1: Locating Wire Harness Clamp Bracket Bolt
      G06010867Courtesy of © TOYOTA, LICENSE AGREEMENT TMS1002
    2. Temporarily install the generator assembly with the 2 bolts.
      Fig 2: Locating Generator Assembly Bolts
      G06010866Courtesy of © TOYOTA, LICENSE AGREEMENT TMS1002
    3. Install the generator connector and wire harness clamp.
    4. Install the wire harness to terminal B with the nut and install the terminal cap.

      Torque: 9.8 N*m (100 kgf*cm, 87 in.*lbf) 

      Fig 3: Identifying Terminal Cap, Nut, Generator Connector And Harness Clamps
      G06010865Courtesy of © TOYOTA, LICENSE AGREEMENT TMS1002
  2. INSTALL V-RIBBED BELT  (See REMOVAL )
  3. ADJUST V-RIBBED BELT  (See REMOVAL )
  4. INSPECT V-RIBBED BELT  (See ON-VEHICLE INSPECTION )
  5. INSTALL ENGINE UNDER COVER RH 
  6. CONNECT CABLE TO NEGATIVE BATTERY TERMINAL 
Factory Service Tools

Use the Manual With the Right Hardware

Pair factory procedures with proven DIY tools so the instructions are easier to execute.

Disclosure: Verified tool recommendations may earn an affiliate commission at no cost to you.

When to See a Mechanic

Stop DIY work and contact a certified mechanic immediately if any of the following apply:

  • • You smell fuel, burning insulation, or see smoke.
  • • Brakes feel soft, pull hard to one side, or make grinding noises.
  • • The engine overheats, stalls repeatedly, or misfires under load.
  • • You are missing required tools, torque specs, or safe lifting equipment.
  • • You are not confident in the next step or safety outcome.