2009 Toyota Land CruiserFACTORY OEM SERVICE PROCEDURE

Charging Systems: Generator: Disassembly

  1. REMOVE GENERATOR PULLEY 

    SST 09820-63011 (09820-06010, 09820-06021) 

    Fig 1: Securing SST On Rotor Shaft
    G05639296Courtesy of © TOYOTA, LICENSE AGREEMENT TMS1002

    HINT:

    SST CHART

    SST 1-A and B 09820-06010
    SST 2 09820-06021
    1. Hold SST 1-A with a torque wrench, and tighten SST 1-B clockwise to the specified torque.

      Torque: 39 N*m (398 kgf*cm, 29 ft.*lbf) 

      NOTE: Check that SST is secured on the rotor shaft.
    2. Mount SST 2 in a vise.
    3. Insert SST 1 -A and B into SST 2, and attach the pulley nut to SST 2.
      Fig 2: Attaching Pulley Nut To SST 2
      G05158233Courtesy of © TOYOTA, LICENSE AGREEMENT TMS1002
    4. To loosen the pulley nut, turn SST 1-A in the direction shown in the illustration.
      NOTE: To prevent damage to the rotor shaft, do not loosen the pulley nut more than one-half turn.
Factory Service Tools

Use the Manual With the Right Hardware

Pair factory procedures with proven DIY tools so the instructions are easier to execute.

Disclosure: Verified tool recommendations may earn an affiliate commission at no cost to you.

When to See a Mechanic

Stop DIY work and contact a certified mechanic immediately if any of the following apply:

  • • You smell fuel, burning insulation, or see smoke.
  • • Brakes feel soft, pull hard to one side, or make grinding noises.
  • • The engine overheats, stalls repeatedly, or misfires under load.
  • • You are missing required tools, torque specs, or safe lifting equipment.
  • • You are not confident in the next step or safety outcome.