2007 Toyota Tacoma X-RunnerFACTORY OEM SERVICE PROCEDURE

Throttle Body: Installation

  1. INSTALL THROTTLE WITH MOTOR BODY ASSEMBLY 
    1. Install a new gasket and the throttle with motor body with the 4 bolts.

      Torque: 11 N*m (112 kgf*cm, 9 ft.*lbf) 

    2. Connect the throttle motor connector.
    3. Connect the water by-pass hose No. 4.
    4. Connect the water by-pass hose No. 5.
  2. INSTALL AIR CLEANER ASSEMBLY 
    1. Install the air cleaner with the 2 bolts.

      Torque: 8.0 N*m (82 kgf*cm, 71 in.*lbf) 

    2. Connect the ventilation hose No. 2.
  3. CONNECT CABLE TO NEGATIVE BATTERY TERMINAL 

    Torque: 3.9 N*m (40 kgf*cm, 35 in.*lbf) 

  4. ADD ENGINE COOLANT  (See REPLACEMENT )
  5. CHECK FOR ENGINE COOLANT LEAKAGE  (See REPLACEMENT )
  6. INSTALL V-BANK COVER 
    1. Install the V-bank cover with the 2 nuts.

      Torque: 7.5 N*m (76 kgf*cm, 66 in.*lbf) 

Factory Service Tools

Use the Manual With the Right Hardware

Pair factory procedures with proven DIY tools so the instructions are easier to execute.

Disclosure: Verified tool recommendations may earn an affiliate commission at no cost to you.

When to See a Mechanic

Stop DIY work and contact a certified mechanic immediately if any of the following apply:

  • • You smell fuel, burning insulation, or see smoke.
  • • Brakes feel soft, pull hard to one side, or make grinding noises.
  • • The engine overheats, stalls repeatedly, or misfires under load.
  • • You are missing required tools, torque specs, or safe lifting equipment.
  • • You are not confident in the next step or safety outcome.