2007 Toyota Matrix Base, AutomaticFACTORY OEM SERVICE PROCEDURE

Charging System (1ZZ-FE): Generator: Installation

  1. INSTALL GENERATOR ASSEMBLY 
    1. Install the generator with the 2 bolts.

      Torque: 

      Bolt A 

      25 N*m (250 kgf*cm, 18 ft.*lbf) 

      Bolt B 

      54 N*m (550 kgf*cm, 40 ft.*lbf) 

      Fig 1: Identifying Generator Bolts
      G05233769Courtesy of © TOYOTA, LICENSE AGREEMENT TMS1002
    2. Connect the A/C connector [B].
    3. Install the wire harness clamp [C].
    4. Connect the generator connector [D].
    5. Install the generator wire with the nut [E].

      Torque: 9.8 N*m (100 kgf*cm, 7 ft.*lbf) 

    6. Install the terminal cap No. 2.
      Fig 2: Identifying A/C Connector, Wire Harness Clamp, Generator Connector And Nut
      G05193529Courtesy of © TOYOTA, LICENSE AGREEMENT TMS1002
  2. INSTALL FAN AND GENERATOR V BELT 

    (See REMOVAL )

  3. INSTALL ENGINE UNDER COVER RH 
  4. CONNECT BATTERY NEGATIVE TERMINAL 

    Torque: 5.4 N*m (55 kgf*cm, 48 in.*lbf) 

Factory Service Tools

Use the Manual With the Right Hardware

Pair factory procedures with proven DIY tools so the instructions are easier to execute.

Disclosure: Verified tool recommendations may earn an affiliate commission at no cost to you.

When to See a Mechanic

Stop DIY work and contact a certified mechanic immediately if any of the following apply:

  • • You smell fuel, burning insulation, or see smoke.
  • • Brakes feel soft, pull hard to one side, or make grinding noises.
  • • The engine overheats, stalls repeatedly, or misfires under load.
  • • You are missing required tools, torque specs, or safe lifting equipment.
  • • You are not confident in the next step or safety outcome.