2007 Toyota FJ Cruiser RWDFACTORY OEM SERVICE PROCEDURE

Camshaft Timing Oil Control Valve Assembly: Removal

  1. DISCONNECT CABLE FROM NEGATIVE BATTERY TERMINAL 
  2. DRAIN ENGINE COOLANT  (See REPLACEMENT )
  3. REMOVE V-BANK COVER  (See REMOVAL  )
  4. REMOVE AIR CLEANER ASSEMBLY  (See REMOVAL  )
  5. REMOVE THROTTLE BODY BRACKET  (See REMOVAL )
  6. REMOVE OIL BAFFLE PLATE  (See REMOVAL )
  7. REMOVE NO. 1 SURGE TANK STAY  (See REMOVAL )
  8. REMOVE NO. 2 SURGE TANK STAY  (See REMOVAL )
  9. REMOVE INTAKE AIR SURGE TANK  (See REMOVAL )
  10. REMOVE CAMSHAFT TIMING OIL CONTROL VALVE ASSEMBLY 
    1. Disconnect the 2 connectors.
    2. Remove the 2 bolts, then remove the 2 camshaft timing oil control valves.
      Fig 1: Identifying Camshaft Timing Oil Control Valve Assembly
      G05108954Courtesy of © TOYOTA, LICENSE AGREEMENT TMS1002
Factory Service Tools

Use the Manual With the Right Hardware

Pair factory procedures with proven DIY tools so the instructions are easier to execute.

Disclosure: Verified tool recommendations may earn an affiliate commission at no cost to you.

When to See a Mechanic

Stop DIY work and contact a certified mechanic immediately if any of the following apply:

  • • You smell fuel, burning insulation, or see smoke.
  • • Brakes feel soft, pull hard to one side, or make grinding noises.
  • • The engine overheats, stalls repeatedly, or misfires under load.
  • • You are missing required tools, torque specs, or safe lifting equipment.
  • • You are not confident in the next step or safety outcome.