2006 Toyota Sienna CEFACTORY OEM SERVICE PROCEDURE

Throttle Body: Installation

  1. INSTALL THROTTLE BODY ASSEMBLY 
    1. Install a new gasket to the intake air connector.
    2. Install the throttle body with the 2 bolts and the 2 nuts.

      Torque: 11 N*m (112 kgf*cm, 8 ft.*lbf) 

    3. Connect the No. 3 water by-pass hose.
    4. Connect the No. 2 water by-pass hose.
    5. Connect the throttle motor connector.
  2. INSTALL AIR CLEANER CAP SUB-ASSEMBLY 

    Torque: 5.0 N*m (51 kgf*cm, 44 in.*lbf) 

  3. ADD ENGINE COOLANT (See  REPLACEMENT  ) 
  4. CHECK FOR ENGINE COOLANT LEAKAGE 

    (See ON-VEHICLE INSPECTION )

  5. INSTALL V-BANK COVER SUB-ASSEMBLY 
    1. Fit the 2 retainers and install the V-bank cover.
    2. Using a socket hexagon wrench 5, tighten the 3 nuts.

      Torque: 7.9 N*m (81 kgf*cm, 70 in.*lbf) 

Factory Service Tools

Use the Manual With the Right Hardware

Pair factory procedures with proven DIY tools so the instructions are easier to execute.

Disclosure: Verified tool recommendations may earn an affiliate commission at no cost to you.

When to See a Mechanic

Stop DIY work and contact a certified mechanic immediately if any of the following apply:

  • • You smell fuel, burning insulation, or see smoke.
  • • Brakes feel soft, pull hard to one side, or make grinding noises.
  • • The engine overheats, stalls repeatedly, or misfires under load.
  • • You are missing required tools, torque specs, or safe lifting equipment.
  • • You are not confident in the next step or safety outcome.