2006 Toyota Matrix Base, FWD, StandardFACTORY OEM SERVICE PROCEDURE

Transfer Assembly: Inspection

WARNING: This page is about a different variant/trim than selected.
  1. INSPECT PRELOAD 
    1. Using SST and a torque wrench, measure the preload of the backlash between the driven pinion and ring gear.

      SST 09326-20011 

      Torque: Preload (at starting) 

      0.30 to 0.53 N*m (3.0 to 5.4 kgf*cm, 2.6 to 4.7 in.*lbf) 

    2. Using SST and a torque wrench, measure the total preload.
      Fig 1: Inspecting Preload
      G04464572Courtesy of © TOYOTA, LICENSE AGREEMENT TMS1002

      SST 09326-20011 

      Torque: Preload (at starting) 

      0.49 to 0.86 N*m (5.0 to 8.8 kgf*cm, 4.3 to 7.6 in.*lbf) 

  2. INSPECT RING GEAR BACKLASH 
    1. Using a dial gauge, check the backlash of the ring gear.

      Backlash: 0.10 to 0.18 mm (0.0039 to 0.0071 in.) 

      If the backlash is not within the specification, adjust the side bearing preload or repair as necessary.

      NOTE: Check at least 3 positions on the circumference of the ring gear.
Factory Service Tools

Use the Manual With the Right Hardware

Pair factory procedures with proven DIY tools so the instructions are easier to execute.

Disclosure: Verified tool recommendations may earn an affiliate commission at no cost to you.

When to See a Mechanic

Stop DIY work and contact a certified mechanic immediately if any of the following apply:

  • • You smell fuel, burning insulation, or see smoke.
  • • Brakes feel soft, pull hard to one side, or make grinding noises.
  • • The engine overheats, stalls repeatedly, or misfires under load.
  • • You are missing required tools, torque specs, or safe lifting equipment.
  • • You are not confident in the next step or safety outcome.