2004 Toyota Sequoia Limited, RWDFACTORY OEM SERVICE PROCEDURE

Throttle Body: Removal

  1. REMOVE THROTTLE BODY COVER 
  2. DRAIN ENGINE COOLANT 
  3. REMOVE INTAKE AIR CONNECTOR 
  4. REMOVE THROTTLE BODY 
    1. Disconnect the throttle control connector.
    2. Disconnect the PCV hose and water bypass hose from the throttle body.
    3. Remove the 2 bolts and 2 nuts, and disconnect the throttle body from the intake manifold.
      Fig 1: Disconnecting PCV Hose
      G04207867Courtesy of © TOYOTA, LICENSE AGREEMENT TMS1002
    4. Disconnect the water bypass hose from the manifold thermostat on the throttle body, and remove the throttle body.
    5. Remove the gasket.
    Fig 2: Disconnecting Water Bypass Hose
    G04207868Courtesy of © TOYOTA, LICENSE AGREEMENT TMS1002
Factory Service Tools

Use the Manual With the Right Hardware

Pair factory procedures with proven DIY tools so the instructions are easier to execute.

Disclosure: Verified tool recommendations may earn an affiliate commission at no cost to you.

When to See a Mechanic

Stop DIY work and contact a certified mechanic immediately if any of the following apply:

  • • You smell fuel, burning insulation, or see smoke.
  • • Brakes feel soft, pull hard to one side, or make grinding noises.
  • • The engine overheats, stalls repeatedly, or misfires under load.
  • • You are missing required tools, torque specs, or safe lifting equipment.
  • • You are not confident in the next step or safety outcome.