1990 Toyota Celica All-TracFACTORY OEM SERVICE PROCEDURE

(3S-FE Engine)

  1. Warm engine to normal operating temperature. Ensure idle speed is correct. Apply parking brake, block drive wheels and place transaxle in Neutral.
  2. Install jumper wire between terminals "TE1" (or "T" on Federal Celica) and "E1" of check connector located near left shock tower. See Figure and Fig 1. Note that engine RPM is maintained at 1000-1300 RPM for 5 seconds then returns to idle.
  3. If engine RPM was not within specification, check ISC valve, wiring to ECU, and ECU grounds.
    NOTE: The ECU is located in front of center console.
  4. To check wiring and ECU, turn ignition on with engine off. With ECU connector plugged in, connect digital voltmeter between ECU terminals "ISC1" and "E1" from wiring side of ECU connector. Battery voltage should be present. Perform same test between "ISC2" and "E1" terminals. For more information on terminal identification, see WIRING DIAGRAMS article or PIN VOLTAGE CHART S article in this section.
  5. To check ISC valve, unplug ISC valve connector on bottom of throttle body. Using ohmmeter, measure resistance between terminals "+B" and "ISC1", and between "ISC2" and "+B". Replace valve if resistance is not within 16-17 ohms.
Fig 1: Location of ISC Valve Connector (3S-FE)
G118943Courtesy of Β© TOYOTA, LICENSE AGREEMENT TMS1002
Factory Service Tools

Use the Manual With the Right Hardware

Pair factory procedures with proven DIY tools so the instructions are easier to execute.

Disclosure: Verified tool recommendations may earn an affiliate commission at no cost to you.

When to See a Mechanic

Stop DIY work and contact a certified mechanic immediately if any of the following apply:

  • β€’ You smell fuel, burning insulation, or see smoke.
  • β€’ Brakes feel soft, pull hard to one side, or make grinding noises.
  • β€’ The engine overheats, stalls repeatedly, or misfires under load.
  • β€’ You are missing required tools, torque specs, or safe lifting equipment.
  • β€’ You are not confident in the next step or safety outcome.