1987 Toyota 4Runner SR5, 22-RTEFACTORY OEM SERVICE PROCEDURE

Electronic Bleed Control Valve (EBCV)

  1. Using an ohmmeter, ensure there is no continuity between positive terminal of EBCV connector and EBCV body. If continuity is indicated, replace shorted EBCV.
  2. Using an ohmmeter, measure resistance between terminals of EBCV connector. Ohmmeter reading should be 11-13 ohms at 68Β°F (20Β°C). If reading is incorrect, replace open EBCV.
Factory Service Tools

Use the Manual With the Right Hardware

Pair factory procedures with proven DIY tools so the instructions are easier to execute.

Disclosure: Verified tool recommendations may earn an affiliate commission at no cost to you.

When to See a Mechanic

Stop DIY work and contact a certified mechanic immediately if any of the following apply:

  • β€’ You smell fuel, burning insulation, or see smoke.
  • β€’ Brakes feel soft, pull hard to one side, or make grinding noises.
  • β€’ The engine overheats, stalls repeatedly, or misfires under load.
  • β€’ You are missing required tools, torque specs, or safe lifting equipment.
  • β€’ You are not confident in the next step or safety outcome.

Rather have a pro handle this?

A certified mobile mechanic comes to your home or office. They bring the tools, you stay comfortable. No tow truck, no waiting room, no surprises.

Comes to youSame-day available12-month warranty
Get a Free Quote

No obligation. See pricing before you book.