1986 Toyota Pickup Base, 22-RTE, R151FFACTORY OEM SERVICE PROCEDURE

Cold Start Injector Time Switch: Van

Points open above 95°F. Connect ohmmeter between Black and Green terminals with connector disconnected at switch. Resistance should be 20-40 ohms less than 86°F and 40-60 ohms greater than 104°F. When checking between black terminal and ground, resistance should be 20-40 ohms less than 86°F and 20-80 ohms greater than 104°F.

Factory Service Tools

Use the Manual With the Right Hardware

Pair factory procedures with proven DIY tools so the instructions are easier to execute.

Disclosure: Verified tool recommendations may earn an affiliate commission at no cost to you.

When to See a Mechanic

Stop DIY work and contact a certified mechanic immediately if any of the following apply:

  • • You smell fuel, burning insulation, or see smoke.
  • • Brakes feel soft, pull hard to one side, or make grinding noises.
  • • The engine overheats, stalls repeatedly, or misfires under load.
  • • You are missing required tools, torque specs, or safe lifting equipment.
  • • You are not confident in the next step or safety outcome.