2006 Suzuki Verona BaseFACTORY OEM SERVICE PROCEDURE

Shift Control Lever Assembly Installation

  1. Install the bolts and the shift control assembly.

    Tighten:Β 

    Tighten the bolts to 8 N.m (71 lb-in.).

    Fig 1: Identifying Shift Control Assembly & Bolts
    G04719702Courtesy of SUZUKI OF AMERICA CORP.
  2. Install the shift control cable onto the bracket and tighten the nut.
  3. Install the shift control cable adjuster pinch nut.

    Tighten:Β 

    Tighten the shift control cable adjuster pinch nut to 8 N.m (71 lb-in.).

    Fig 2: Identifying Shift Control Cable & Bracket
    G04719701Courtesy of SUZUKI OF AMERICA CORP.
  4. Connect the electrical switch connectors.
  5. Install the floor console. Refer to FLOOR CONSOLE INSTALLATION .
  6. Connect the negative battery cable.
Fig 3: Identifying Electrical Switch Connectors
G04719700Courtesy of SUZUKI OF AMERICA CORP.
Factory Service Tools

Use the Manual With the Right Hardware

Pair factory procedures with proven DIY tools so the instructions are easier to execute.

Disclosure: Verified tool recommendations may earn an affiliate commission at no cost to you.

When to See a Mechanic

Stop DIY work and contact a certified mechanic immediately if any of the following apply:

  • β€’ You smell fuel, burning insulation, or see smoke.
  • β€’ Brakes feel soft, pull hard to one side, or make grinding noises.
  • β€’ The engine overheats, stalls repeatedly, or misfires under load.
  • β€’ You are missing required tools, torque specs, or safe lifting equipment.
  • β€’ You are not confident in the next step or safety outcome.