2006 Suzuki Verona BaseFACTORY OEM SERVICE PROCEDURE

Shift Control Cable Installation

  1. Install the shift control cable into the fire wall of the vehicle.
  2. Install the shift control cable onto the transaxle mount.
    Fig 1: Identifying Shift Control Cable & Transaxle Mount
    G04719708Courtesy of SUZUKI OF AMERICA CORP.
  3. Install the shift control cable onto the shift control assembly.
  4. Tighten the nut on the cable bracket.
  5. Install the shift control cable adjuster pinch nut.

    Tighten:Β 

    Tighten the nut to 8 N.m (71 lb-in.).

    Fig 2: Identifying Shift Control Cable & Shift Control Assembly
    G04719701Courtesy of SUZUKI OF AMERICA CORP.
  6. Install the clip to the shift control cable at the transaxle mount connection.
  7. Install the clip to the select lever connection on the transaxle case.
  8. Adjust the shift control cable. Refer to Shift Control Cable AdjustmentΒ .
  9. Install the air filter housing assembly and bolts.

    Tighten:Β 

    Tighten the bolts to 10 N.m (89 lb-in.).

  10. Connect the negative battery cable.
Fig 3: Identifying Shift Control Cable & Clip
G04717246Courtesy of SUZUKI OF AMERICA CORP.
Factory Service Tools

Use the Manual With the Right Hardware

Pair factory procedures with proven DIY tools so the instructions are easier to execute.

Disclosure: Verified tool recommendations may earn an affiliate commission at no cost to you.

When to See a Mechanic

Stop DIY work and contact a certified mechanic immediately if any of the following apply:

  • β€’ You smell fuel, burning insulation, or see smoke.
  • β€’ Brakes feel soft, pull hard to one side, or make grinding noises.
  • β€’ The engine overheats, stalls repeatedly, or misfires under load.
  • β€’ You are missing required tools, torque specs, or safe lifting equipment.
  • β€’ You are not confident in the next step or safety outcome.