1994 Suzuki Sidekick JS, 2D Utility, AutomaticFACTORY OEM SERVICE PROCEDURE

Igniter (Power Unit)

  1. Turn ignition on. Using voltmeter, check for battery voltage at ignition coil, between coil positive terminal (Black/White wire) and ground. If battery voltage does not exist, check ignition fuse circuit.
  2. To test igniter, turn ignition off. Remove igniter from under ignition coil. Tape together two 1.5-volt dry cell batteries in series to create a 3-volt power source. Connect a jumper wire from igniter terminal "G" to negative side of 3-volt power source. Connect another jumper wire from igniter terminal IB to positive side of 3-volt power source. See Fig 1 .
  3. Using ohmmeter, connect positive ohmmeter lead to igniter terminal "G" and negative ohmmeter lead to igniter terminal OC. See Fig 1 . Check for continuity with 3-volt power source applied. No continuity should be present with 3-volt power source disconnected from igniter. Replace igniter if test results are not within specification.
Fig 1: Testing Igniter
G119580Courtesy of SUZUKI OF AMERICA CORP.
Factory Service Tools

Use the Manual With the Right Hardware

Pair factory procedures with proven DIY tools so the instructions are easier to execute.

Disclosure: Verified tool recommendations may earn an affiliate commission at no cost to you.

When to See a Mechanic

Stop DIY work and contact a certified mechanic immediately if any of the following apply:

  • β€’ You smell fuel, burning insulation, or see smoke.
  • β€’ Brakes feel soft, pull hard to one side, or make grinding noises.
  • β€’ The engine overheats, stalls repeatedly, or misfires under load.
  • β€’ You are missing required tools, torque specs, or safe lifting equipment.
  • β€’ You are not confident in the next step or safety outcome.