2013 Subaru TribecaFACTORY OEM SERVICE PROCEDURE

VDC Control Module and Hydraulic Control Unit (VDCCM&H/U): Installation

  1. Install the VDCCM&H/U to the bracket.

    Tightening torque:Β 

    7.5 N.m (0.76 kgf-m, 5.53 ft-lb)Β 

  2. Install the VDCCM&H/U bracket.

    Tightening torque:Β 

    33 N.m (3.3 kgf-m, 24.3 ft-lb)Β 

  3. Connect the brake pipes to their correct VDCCM& H/U positions.

    Tightening torque:Β 

    < Ref. to Β FRONT BRAKE PIPES AND HOSESΒ  , COMPONENT, General Description. >Β 

  4. Connect the VDCCM&H/U connector.
    NOTE:
    • Be sure to remove all foreign matter from inside the connector before connecting.
    • Make sure the VDCCM&H/U connector is securely locked.
  5. Bleed air from the brake system.
Factory Service Tools

Use the Manual With the Right Hardware

Pair factory procedures with proven DIY tools so the instructions are easier to execute.

Disclosure: Verified tool recommendations may earn an affiliate commission at no cost to you.

When to See a Mechanic

Stop DIY work and contact a certified mechanic immediately if any of the following apply:

  • β€’ You smell fuel, burning insulation, or see smoke.
  • β€’ Brakes feel soft, pull hard to one side, or make grinding noises.
  • β€’ The engine overheats, stalls repeatedly, or misfires under load.
  • β€’ You are missing required tools, torque specs, or safe lifting equipment.
  • β€’ You are not confident in the next step or safety outcome.

Rather have a pro handle this?

A certified mobile mechanic comes to your home or office. They bring the tools, you stay comfortable. No tow truck, no waiting room, no surprises.

Comes to youSame-day available12-month warranty
Get a Free Quote

No obligation. See pricing before you book.