2012 Subaru Outback Base, Standard TransFACTORY OEM SERVICE PROCEDURE

Front Drive Shaft: Assembly

WARNING: This page is about a different car, the 2011 Subaru Tribeca. However, it is still accessible from the selected car via links, so may be relevant.
NOTE: Use specified grease.

PTJ side:Β 

NKG302Β 

  1. Place the PTJ boot at the center of shaft.
  2. Align alignment marks and install the trunnion on the shaft.
    Fig 1: Identifying Alignment Marks On Trunnion And Shaft
    G06343485Courtesy of SUBARU OF AMERICA, INC.
  3. Install the snap ring to shaft.
    CAUTION: Confirm that the snap ring is completely fitted in shaft groove.
  4. Fill 100 to 110 g (3.53 to 3.88 oz) of specified grease into the interior of PTJ outer race.
  5. Apply a thin coat of specified grease to the roller kit and trunnion.
  6. Align alignment marks on roller kit and trunnion and install the roller kit.
    CAUTION: Be careful with the roller kit position.
Factory Service Tools

Use the Manual With the Right Hardware

Pair factory procedures with proven DIY tools so the instructions are easier to execute.

Disclosure: Verified tool recommendations may earn an affiliate commission at no cost to you.

When to See a Mechanic

Stop DIY work and contact a certified mechanic immediately if any of the following apply:

  • β€’ You smell fuel, burning insulation, or see smoke.
  • β€’ Brakes feel soft, pull hard to one side, or make grinding noises.
  • β€’ The engine overheats, stalls repeatedly, or misfires under load.
  • β€’ You are missing required tools, torque specs, or safe lifting equipment.
  • β€’ You are not confident in the next step or safety outcome.