2009 Subaru Legacy GT spec.BFACTORY OEM SERVICE PROCEDURE

Intake Manifold: Installation

  1. Install the intake manifold onto cylinder heads.
    NOTE: Use a new gasket.

    Tightening torque:Β 

    25 N.m (2.5 kgf-m, 18.4 ft-lb)Β 

    Fig 1: Locating Tumble Generator Valve Assembly And Bolts
    G05340088Courtesy of SUBARU OF AMERICA, INC.
  2. Connect the fuel delivery hose, fuel return hose, and evaporation hose. Refer to INSTALLATIONΒ , Fuel Delivery, Return and Evaporation Lines.
    NOTE: If fuel hoses or clamps are damaged, replace them with new parts.
Factory Service Tools

Use the Manual With the Right Hardware

Pair factory procedures with proven DIY tools so the instructions are easier to execute.

Disclosure: Verified tool recommendations may earn an affiliate commission at no cost to you.

When to See a Mechanic

Stop DIY work and contact a certified mechanic immediately if any of the following apply:

  • β€’ You smell fuel, burning insulation, or see smoke.
  • β€’ Brakes feel soft, pull hard to one side, or make grinding noises.
  • β€’ The engine overheats, stalls repeatedly, or misfires under load.
  • β€’ You are missing required tools, torque specs, or safe lifting equipment.
  • β€’ You are not confident in the next step or safety outcome.