2008 Subaru Outback XT Limited, AutomaticFACTORY OEM SERVICE PROCEDURE

Oil Flow Control Solenoid Valve: Assembly

  1. Install the oil flow control solenoid valve.

    Tightening torque: 

    8 N.m (0.8 kgf-m, 5.9 ft-lb) 

  2. Apply liquid gasket to the two bolts which secure the oil return cover.

    Liquid gasket: 

    THREE BOND 1324 (Part No. 004403042) or equivalent 

  3. Attach the oil return cover and gasket.

    Tightening torque: 

    8 N.m (0.8 kgf-m, 5.9 ft-lb) 

    NOTE: Use a new gasket.
Factory Service Tools

Use the Manual With the Right Hardware

Pair factory procedures with proven DIY tools so the instructions are easier to execute.

Disclosure: Verified tool recommendations may earn an affiliate commission at no cost to you.

When to See a Mechanic

Stop DIY work and contact a certified mechanic immediately if any of the following apply:

  • • You smell fuel, burning insulation, or see smoke.
  • • Brakes feel soft, pull hard to one side, or make grinding noises.
  • • The engine overheats, stalls repeatedly, or misfires under load.
  • • You are missing required tools, torque specs, or safe lifting equipment.
  • • You are not confident in the next step or safety outcome.

Rather have a pro handle this?

A certified mobile mechanic comes to your home or office. They bring the tools, you stay comfortable. No tow truck, no waiting room, no surprises.

Comes to youSame-day available12-month warranty
Get a Free Quote

No obligation. See pricing before you book.