2008 Subaru Outback Base, AutomaticFACTORY OEM SERVICE PROCEDURE

Front Ball Joint: Installation

  1. Insert the ball joint into housing.

    Tightening torque (Bolt): 

    50 N.m (5.1 kgf-m, 36.9 ft-lb) 

    CAUTION: Do not apply grease to the tapered portion of ball stud.
  2. Install the ball joint into front arm.

    Tightening torque (castle nut): 

    Front arm (aluminum type): 

    30 N.m (3.1 kgf-m, 22 ft-lb) 

    Front arm (steel type): 

    39 N.m (4.0 kgf-m, 28.8 ft-lb) 

  3. Retighten the castle nut further up to 60° until the hole in the ball stud is aligned with a slot in castle nut. Then, insert a new cotter pin and bend it around the castle nut.
  4. Install the stabilizer bracket.
    NOTE: The stabilizer bracket has a set orientation. Install it with the arrow mark facing the upper side of the vehicle.
Factory Service Tools

Use the Manual With the Right Hardware

Pair factory procedures with proven DIY tools so the instructions are easier to execute.

Disclosure: Verified tool recommendations may earn an affiliate commission at no cost to you.

When to See a Mechanic

Stop DIY work and contact a certified mechanic immediately if any of the following apply:

  • • You smell fuel, burning insulation, or see smoke.
  • • Brakes feel soft, pull hard to one side, or make grinding noises.
  • • The engine overheats, stalls repeatedly, or misfires under load.
  • • You are missing required tools, torque specs, or safe lifting equipment.
  • • You are not confident in the next step or safety outcome.