2008 Subaru Outback Base, AutomaticFACTORY OEM SERVICE PROCEDURE

Starting System & Charging System (H4SO): Generator: Inspection: Stator

  1. Continuity test

    Inspect continuity between the stator coil lead wire terminals. If the resistance is 1 MΞ© or more, the lead wire is damaged. Replace the stator assembly.

    Fig 1: Checking Continuity Between Stator Coil Lead Wire Terminals
    G05339798Courtesy of SUBARU OF AMERICA, INC.
  2. Insulation test

    Inspect the continuity between the stator coil stator core and lead wire terminals. If the resistance is 1 Ξ© or less, the stator coil is grounded. Replace the stator assembly.

    Fig 2: Checking Continuity Between Stator Coil Stator Core And Lead Wire Terminals
    G04997985Courtesy of SUBARU OF AMERICA, INC.
Factory Service Tools

Use the Manual With the Right Hardware

Pair factory procedures with proven DIY tools so the instructions are easier to execute.

Disclosure: Verified tool recommendations may earn an affiliate commission at no cost to you.

When to See a Mechanic

Stop DIY work and contact a certified mechanic immediately if any of the following apply:

  • β€’ You smell fuel, burning insulation, or see smoke.
  • β€’ Brakes feel soft, pull hard to one side, or make grinding noises.
  • β€’ The engine overheats, stalls repeatedly, or misfires under load.
  • β€’ You are missing required tools, torque specs, or safe lifting equipment.
  • β€’ You are not confident in the next step or safety outcome.