2006 Subaru Outback XT Limited, AutomaticFACTORY OEM SERVICE PROCEDURE

Intake Manifold: Assembly

  1. Install the intake manifold (lower) to the intake manifold (upper).
    NOTE: Use new O-rings.

    Tightening torque: 

    8.3 N.m (0.85 kgf-m, 6.1 ft-lb) 

    Fig 1: Identifying Intake Manifolds
    G05017777
  2. Install the fuel injector pipe.
  3. Connect fuel hoses to fuel injector pipes on both sides, and secure them with the clamps.
    Fig 2: Identifying Fuel Injector Pipe Hose Clamp
    G05017776
  4. Tighten the bolts which secure the fuel injector pipe RH to the lower side of the intake manifold.

    Tightening torque: 

    6.5 N.m (0.66 kgf-m, 4.8 ft-lb) 

    Fig 3: Locating Fuel Injector Pipe RH Onto Lower Side Of Intake Manifold Bolts
    G05017775
  5. Tighten the bolts which secure the fuel pipe to the intake manifold.

    Tightening torque: 

    6.5 N.m (0.66 kgf-m, 4.8 ft-lb) 

    Fig 4: Locating Fuel Pipe Bolts
    G05017774
  6. Tighten the bolts which secure fuel injector pipe onto intake manifold.

    Tightening torque: 

    19 N.m (1.9 kgf-m, 14 ft-lb) 

    • LH side
      Fig 5: Locating Fuel Injector Pipe Onto Intake Manifold Bolts - LH Side
      G05017773
    • RH side
      Fig 6: Locating Fuel Injector Pipe Onto Intake Manifold Bolts - RH Side
      G05017772
  7. Install the coolant filler tank stay to the intake manifold.

    Tightening torque: 

    19 N.m (1.9 kgf-m, 14 ft-lb) 

    Fig 7: Identifying Coolant Filler Tank Stay From Intake Manifold
    G05017771
  8. Tighten the bolt which holds the fuel injector pipe LH to the front side of the intake manifold.

    Tightening torque: 

    6.5 N.m (0.66 kgf-m, 4.8 ft-lb) 

    Fig 8: Locating Fuel Injector Pipe Bolt
    G05017770
  9. Install PCV pipe (A), harness assembly (B) and intake duct (C) to the intake manifold.

    Tightening torque: 

    6.5 N.m (0.66 kgf-m, 4.8 ft-lb) 

    Fig 9: Identifying PCV Pipe, Harness Assembly And Intake Duct From Intake Manifold
    G05017769
  10. Tighten the bolts which secure the air bypass pipe to the intake manifold.

    Tightening torque: 

    6.5 N.m (0.66 kgf-m, 4.8 ft-lb) 

    Fig 10: Locating Air By-Pass Pipe Bolts
    G05017768
  11. Install the connectors to fuel injector (A), tumble generator valve position sensor (B) and tumble generator valve actuator (C).
    Fig 11: Identifying Fuel Injector, Tumble Generator Valve Position Sensor And Tumble Generator Valve Actuator
    G05017767
  12. Install the throttle body to intake manifold.
    NOTE: Use new O-rings.

    Tightening torque: 

    8 N.m (0.8 kgf-m, 5.9 ft-lb) 

    Fig 12: Locating Throttle Body To Intake Manifold Bolts
    G05017734
  13. Connect the connector to the throttle position sensor.
    Fig 13: Locating Throttle Position Sensor Connector
    G05017732
  14. Connect the evaporation hose (A) and filter assembly (B).
    Fig 14: Identifying Evaporation Hose And Filter Assembly
    G05017764
Factory Service Tools

Use the Manual With the Right Hardware

Pair factory procedures with proven DIY tools so the instructions are easier to execute.

Disclosure: Verified tool recommendations may earn an affiliate commission at no cost to you.

When to See a Mechanic

Stop DIY work and contact a certified mechanic immediately if any of the following apply:

  • • You smell fuel, burning insulation, or see smoke.
  • • Brakes feel soft, pull hard to one side, or make grinding noises.
  • • The engine overheats, stalls repeatedly, or misfires under load.
  • • You are missing required tools, torque specs, or safe lifting equipment.
  • • You are not confident in the next step or safety outcome.