2005 Subaru Outback F6-3.0LFACTORY OEM SERVICE PROCEDURE

Battery: Service and Repair

Battery

REMOVAL
1. Disconnect the positive (+) terminal after disconnecting the negative (-) terminal of battery.

Factory service manual diagram



2. Remove the flange nuts from battery rods and take off battery holder.
3. Remove the battery.

INSTALLATION
Install in the reverse order of removal.

Tightening torque: 3.4 N.m (0.35 kgf.m, 2.5 ft.lb)

NOTE:
- Clean the battery cable terminals and apply grease to retard the formation of corrosion.
- Connect the positive (+) terminal, and then connect the negative (-) terminal of battery.
- Initial diagnosis of electronic control throttle is performed after battery installation. For this reason, start the engine after 10 seconds or more have elapsed since the ignition switch was turned to ON.
Chapter Navigation
Factory Service Tools

Use the Manual With the Right Hardware

Pair factory procedures with proven DIY tools so the instructions are easier to execute.

Disclosure: Verified tool recommendations may earn an affiliate commission at no cost to you.

When to See a Mechanic

Stop DIY work and contact a certified mechanic immediately if any of the following apply:

  • β€’ You smell fuel, burning insulation, or see smoke.
  • β€’ Brakes feel soft, pull hard to one side, or make grinding noises.
  • β€’ The engine overheats, stalls repeatedly, or misfires under load.
  • β€’ You are missing required tools, torque specs, or safe lifting equipment.
  • β€’ You are not confident in the next step or safety outcome.