2002 Subaru Forester BaseFACTORY OEM SERVICE PROCEDURE

Control Valve Body: Removal

  1. Lift-up the vehicle.
  2. Clean transmission exterior.
  3. Drain ATF completely.
    NOTE: Tighten ATF drain plug after draining ATF.

    Tightening torque:Β  25 N.m (2.5 kgf-m, 18.1 ft-lb)

    Fig 1: Tightening ATF Drain Plug
    G02862513Courtesy of SUBARU OF AMERICA, INC.
  4. Remove the oil pan.
    NOTE:
    • Remove and clean the magnet.
    • Remove the old gasket on the oil pan and transmission case completely.
  5. Disconnect duty solenoids and ATF temperature sensor connectors. Remove connectors from clip and disconnect connectors.
    Fig 2: Disconnecting Duty Solenoids And ATF Temperature Sensor Connectors
    G02862514Courtesy of SUBARU OF AMERICA, INC.
  6. Remove the control valve. When removing control valve body, be careful not to interfere with transfer duty solenoid wiring
    Fig 3: Removing Control Valve
    G02862515Courtesy of SUBARU OF AMERICA, INC.
Factory Service Tools

Use the Manual With the Right Hardware

Pair factory procedures with proven DIY tools so the instructions are easier to execute.

Disclosure: Verified tool recommendations may earn an affiliate commission at no cost to you.

When to See a Mechanic

Stop DIY work and contact a certified mechanic immediately if any of the following apply:

  • β€’ You smell fuel, burning insulation, or see smoke.
  • β€’ Brakes feel soft, pull hard to one side, or make grinding noises.
  • β€’ The engine overheats, stalls repeatedly, or misfires under load.
  • β€’ You are missing required tools, torque specs, or safe lifting equipment.
  • β€’ You are not confident in the next step or safety outcome.