1978 Subaru GF Automatic TransFACTORY OEM SERVICE PROCEDURE

Primary Circuit Check

  1. Ensure ignition switch is off. Disconnect ignition unit 2-pin connector from unit. Turn ignition on. Connect negative lead of voltmeter to ground and positive lead to Blue wire terminal of connector. See Fig 1. Measure voltage and turn ignition off.
  2. If voltmeter reads battery voltage, proceed to IGNITION UNIT & PICK-UP COIL CHECK . If voltage is not within battery voltage, check condition and continuity of primary circuit wiring and connectors. If no problems are found, proceed to IGNITION COIL CHECK .
    Fig 1: 1979 Datsun Primary Circuit Voltage Check (Others Similar)
    G09350955Courtesy of NOT AVAILABLE
Chapter Navigation
Factory Service Tools

Use the Manual With the Right Hardware

Pair factory procedures with proven DIY tools so the instructions are easier to execute.

Disclosure: Verified tool recommendations may earn an affiliate commission at no cost to you.

When to See a Mechanic

Stop DIY work and contact a certified mechanic immediately if any of the following apply:

  • • You smell fuel, burning insulation, or see smoke.
  • • Brakes feel soft, pull hard to one side, or make grinding noises.
  • • The engine overheats, stalls repeatedly, or misfires under load.
  • • You are missing required tools, torque specs, or safe lifting equipment.
  • • You are not confident in the next step or safety outcome.