1978 Subaru GF Automatic TransFACTORY OEM SERVICE PROCEDURE

HITACHI Electronic Ignition: Overhaul: Disassembly

  1. Remove distributor cap and rotor. Remove ignition unit by disconnecting harness, removing mounting screws, and disconnecting pick-up coil wires.
  2. Remove stator and magnet. Remove vacuum controller and carefully pry reluctor from shaft. Remove roll pin, pick-up coil assembly, and breaker plate assembly. Remove pin and pinion gear. Remove rotor shaft and drive shaft assembly.
    Fig 1: 1979 Datsun Pick-Up Coil Terminals (Others Similar)
    G09350957Courtesy of NOT AVAILABLE
  3. Mark rotor and drive shafts for reassembly reference. Remove packing and rotor shaft set screw. Mark one governor spring and its bracket; also one weight and its pivot pin. Remove weights and springs.
Chapter Navigation
Factory Service Tools

Use the Manual With the Right Hardware

Pair factory procedures with proven DIY tools so the instructions are easier to execute.

Disclosure: Verified tool recommendations may earn an affiliate commission at no cost to you.

When to See a Mechanic

Stop DIY work and contact a certified mechanic immediately if any of the following apply:

  • β€’ You smell fuel, burning insulation, or see smoke.
  • β€’ Brakes feel soft, pull hard to one side, or make grinding noises.
  • β€’ The engine overheats, stalls repeatedly, or misfires under load.
  • β€’ You are missing required tools, torque specs, or safe lifting equipment.
  • β€’ You are not confident in the next step or safety outcome.