1978 Subaru FEFACTORY OEM SERVICE PROCEDURE

NIPPONDENSO Electronic Ignition System: Overhaul: Reassembly

Reassemble distributor in reverse order of disassembly. Lightly grease timing rotor (reluctor) inner surface. Install on shaft, aligning "12" mark with stop. Install long spring on "14" side of timing rotor. Install Blue washer, spring, thin washer, bearing and thick washer on shaft in order. Install new pinion gear. Adjust pick-up coil air gap.

Chapter Navigation
Factory Service Tools

Use the Manual With the Right Hardware

Pair factory procedures with proven DIY tools so the instructions are easier to execute.

Disclosure: Verified tool recommendations may earn an affiliate commission at no cost to you.

When to See a Mechanic

Stop DIY work and contact a certified mechanic immediately if any of the following apply:

  • β€’ You smell fuel, burning insulation, or see smoke.
  • β€’ Brakes feel soft, pull hard to one side, or make grinding noises.
  • β€’ The engine overheats, stalls repeatedly, or misfires under load.
  • β€’ You are missing required tools, torque specs, or safe lifting equipment.
  • β€’ You are not confident in the next step or safety outcome.