1978 Subaru FEFACTORY OEM SERVICE PROCEDURE

NIPPONDENSO Electronic Ignition System: Overhaul: Disassembly

  1. Remove distributor cap, rotor, dust cover and packing. Remove pick-up coil assembly, vacuum advance mechanism, breaker plate and drive pinion. SeeΒ Figure. Discard pinion.
  2. Remove 2 screws from bottom of distributor housing and using a plastic hammer, carefully drive out shaft. Remove thick washer, bearing, thin washer, spring, and Blue washer from shaft. Remove governor springs, timing rotor (reluctor), weight snap rings and weights.
Chapter Navigation
Factory Service Tools

Use the Manual With the Right Hardware

Pair factory procedures with proven DIY tools so the instructions are easier to execute.

Disclosure: Verified tool recommendations may earn an affiliate commission at no cost to you.

When to See a Mechanic

Stop DIY work and contact a certified mechanic immediately if any of the following apply:

  • β€’ You smell fuel, burning insulation, or see smoke.
  • β€’ Brakes feel soft, pull hard to one side, or make grinding noises.
  • β€’ The engine overheats, stalls repeatedly, or misfires under load.
  • β€’ You are missing required tools, torque specs, or safe lifting equipment.
  • β€’ You are not confident in the next step or safety outcome.