2010 Saturn Sky Red Line, AutomaticFACTORY OEM SERVICE PROCEDURE

Installation Procedure

    Fig 1: View Of Throttle Body & Bolts
    GM1769706Courtesy of GENERAL MOTORS CORP.
  1. Inspect the throttle body seal, and replace if necessary.
  2. Position the throttle body to the intake manifold.
  3. CAUTION: Refer to Fastener Caution .
  4. Install the throttle body bolts and tighten to 10 N.m (89 lb in).
  5. Fig 2: Identifying Brake Booster Auxiliary Pump Connector
    GM1826929Courtesy of GENERAL MOTORS CORP.
  6. Connect the engine wiring harness electrical connector (1) to the brake booster auxiliary pump.
  7. Install the brake booster auxiliary pump electrical connector clip to the bracket.
  8. Fig 3: Identifying ETC Connector
    GM1825527Courtesy of GENERAL MOTORS CORP.
  9. Connect the engine wiring harness electrical connector (1) to the ETC.
  10. Install the charge air cooler outlet pipe. Refer to Charge Air Cooler Outlet Pipe ReplacementΒ .
Factory Service Tools

Use the Manual With the Right Hardware

Pair factory procedures with proven DIY tools so the instructions are easier to execute.

Disclosure: Verified tool recommendations may earn an affiliate commission at no cost to you.

When to See a Mechanic

Stop DIY work and contact a certified mechanic immediately if any of the following apply:

  • β€’ You smell fuel, burning insulation, or see smoke.
  • β€’ Brakes feel soft, pull hard to one side, or make grinding noises.
  • β€’ The engine overheats, stalls repeatedly, or misfires under load.
  • β€’ You are missing required tools, torque specs, or safe lifting equipment.
  • β€’ You are not confident in the next step or safety outcome.