2007 Saturn Vue Green LineFACTORY OEM SERVICE PROCEDURE

Installation Procedure

    Fig 1: Identifying ECM Bracket And ECM
    GM1813961Courtesy of GENERAL MOTORS CORP.
  1. Install the ECM (2) to the ECM bracket.
  2. Install the ECM bracket (1) to the battery hold down bracket.
  3. Fig 2: Identifying Hybrid-Related Harness Retainers
    GM1820895Courtesy of GENERAL MOTORS CORP.
  4. Install the 36 volt positive battery cable retainer (4) to the ECM bracket.
  5. Fig 3: Engine Wiring Harness Electrical Connectors At Engine Control Module (ECM)
    GM1814522Courtesy of GENERAL MOTORS CORP.
  6. Connect the engine wiring harness electrical connectors (2) to the ECM.
  7. Fig 4: Body Wiring Harness Electrical Connector At Engine Control Module (ECM)
    GM1814521Courtesy of GENERAL MOTORS CORP.
  8. Connect the body wiring harness electrical connector (1) to the ECM.
  9. Connect the negative battery cable. Refer to Battery Negative Cable Disconnection and Connection (2.4L (LAT)) .
  10. Install the generator battery control module cover. Refer to Generator Battery Control Module Cover Replacement .
  11. Program the ECM. Refer to Control Module References .
Factory Service Tools

Use the Manual With the Right Hardware

Pair factory procedures with proven DIY tools so the instructions are easier to execute.

Disclosure: Verified tool recommendations may earn an affiliate commission at no cost to you.

When to See a Mechanic

Stop DIY work and contact a certified mechanic immediately if any of the following apply:

  • β€’ You smell fuel, burning insulation, or see smoke.
  • β€’ Brakes feel soft, pull hard to one side, or make grinding noises.
  • β€’ The engine overheats, stalls repeatedly, or misfires under load.
  • β€’ You are missing required tools, torque specs, or safe lifting equipment.
  • β€’ You are not confident in the next step or safety outcome.