2004 Saturn Ion Red LineFACTORY OEM SERVICE PROCEDURE

Installation Procedure

  1. Position the generator on the engine.
  2. NOTE: Refer to Fastener Notice in Cautions and Notices.
  3. Install the generator bolts.

    Tighten:Β  Tighten the generator bolts to 25 N.m (18 lb ft).

  4. Fig 1: View Of Generator
    GM1381708Courtesy of GENERAL MOTORS CORP.
  5. Connect the positive battery harness to the generator battery terminal.

    Tighten:Β  Tighten the generator terminal nut to 20 N.m (15 lb ft).

  6. Connect the generator harness connectors.
  7. Install the supercharger. Refer to Supercharger Replacement in Engine Mechanical - 2.0L (LSJ).
  8. Install the drive belt. Refer to Drive Belt Replacement in Engine Mechanical - 2.0L (LSJ).
  9. Connect the battery negative cable. Refer to Battery Negative Cable Disconnect/Connect ProcedureΒ .
Factory Service Tools

Use the Manual With the Right Hardware

Pair factory procedures with proven DIY tools so the instructions are easier to execute.

Disclosure: Verified tool recommendations may earn an affiliate commission at no cost to you.

When to See a Mechanic

Stop DIY work and contact a certified mechanic immediately if any of the following apply:

  • β€’ You smell fuel, burning insulation, or see smoke.
  • β€’ Brakes feel soft, pull hard to one side, or make grinding noises.
  • β€’ The engine overheats, stalls repeatedly, or misfires under load.
  • β€’ You are missing required tools, torque specs, or safe lifting equipment.
  • β€’ You are not confident in the next step or safety outcome.