2002 Saturn L100 L4-2.2L VIN FFACTORY OEM SERVICE PROCEDURE

Intake Manifold

L61 ENGINE TORQUE SPECIFICATIONS
Intake Manifold-to-Cylinder Head Bolts 10 Nm (89 inch lbs.)
Intake Manifold-to-Cylinder Head Nuts 10 Nm (89 inch lbs.)
Intake Manifold-to-Cylinder Head Studs 6 Nm (60 inch lbs.)
Throttle Body Bolts 10 Nm (89 inch lbs.)
Throttle Body Nuts 10 Nm (89 inch lbs.)
Throttle Body Studs-to-Cylinder Head 6 Nm (60 inch lbs.)
Throttle Cable Bracket Nuts 5 Nm (44 inch lbs.)
Throttle Position Sensor Screws 2 Nm (18 inch lbs.)

Tightening Sequence

Intake Manifold
- Install intake manifold.
- Install intake manifold bolts and nuts. Tighten by starting from center bolt and working outward.
Intake Manifold-to-Cylinder Head Bolts: 10 Nm (89 inch lbs.)
Intake Manifold-to-Cylinder Head Nuts: 10 Nm (89 inch lbs.)
Factory Service Tools

Use the Manual With the Right Hardware

Pair factory procedures with proven DIY tools so the instructions are easier to execute.

Disclosure: Verified tool recommendations may earn an affiliate commission at no cost to you.

When to See a Mechanic

Stop DIY work and contact a certified mechanic immediately if any of the following apply:

  • β€’ You smell fuel, burning insulation, or see smoke.
  • β€’ Brakes feel soft, pull hard to one side, or make grinding noises.
  • β€’ The engine overheats, stalls repeatedly, or misfires under load.
  • β€’ You are missing required tools, torque specs, or safe lifting equipment.
  • β€’ You are not confident in the next step or safety outcome.