2003 Porsche Boxster (986) F6-2.7LFACTORY OEM SERVICE PROCEDURE

General Test Point



General Test Point

No communication with the Porsche System Tester 2.

Test
1. Test voltage supply at the 16-pole data link connector (on the left in the driver's footwell).

NOTE: The alarm system must be deactivated.


Factory service manual diagram



Factory service manual diagram





Connector assignment:
Pin 4 Ground
Pin 5 Electronics ground
Pin 16 Supply voltage (terminal 30) via fuse B 1
Pin 7 Diagnosis K-line via alarm control module

2. Ignition "ON"
Connect voltmeter to pin 16 and pin 4
Display: approx. 12 Volt

Connect voltmeter to pin 16 and pin 5
Display: approx. 12 Volt


Factory service manual diagram





A - DME control module
B - Alarm control module
C - Data link connector
Factory Service Tools

Use the Manual With the Right Hardware

Pair factory procedures with proven DIY tools so the instructions are easier to execute.

Disclosure: Verified tool recommendations may earn an affiliate commission at no cost to you.

When to See a Mechanic

Stop DIY work and contact a certified mechanic immediately if any of the following apply:

  • β€’ You smell fuel, burning insulation, or see smoke.
  • β€’ Brakes feel soft, pull hard to one side, or make grinding noises.
  • β€’ The engine overheats, stalls repeatedly, or misfires under load.
  • β€’ You are missing required tools, torque specs, or safe lifting equipment.
  • β€’ You are not confident in the next step or safety outcome.