2000 Porsche Boxster (986) F6-2.7LFACTORY OEM SERVICE PROCEDURE

Connecting Rod Bearing





Factory service manual diagram





LEGEND
1 Connecting Rod Bolt
2 Connecting Rod Bearing Cap
3 Connecting Rod, Cylinder 4
4 Connecting Rod Bearing Cap
5 Connecting Rod, Cylinder 5
6 Connecting Rod Bearing Cap
7 Connecting Rod, Cylinder 6
8 Connecting Rod Bearing Shell Half
9 Thrust Bearing Screw 9 x 129 mm
10 Bearing Housing Half (Cylinders 1-3)
11 Crankcase Bearing Shell Half
12 Piston Spray Nozzle In Bearing Housing Half (Cylinders 1-3)
13 Cylindrical Pin A4.0 x 10 mm
14 Roll Pin 6.0 x 16 mm
15 Crankshaft
26 Thrust Plate
17 Crankcase Bearing Shell Half
18 Piston Spray Nozzle In Bearing Housing Half (Cylinders 4-6)
19 Dowel Sleeks
20 Pin For Tensioning Rail
21 Bearing Housing Half (Cylinders 4-6)

Factory Service Tools

Use the Manual With the Right Hardware

Pair factory procedures with proven DIY tools so the instructions are easier to execute.

Disclosure: Verified tool recommendations may earn an affiliate commission at no cost to you.

When to See a Mechanic

Stop DIY work and contact a certified mechanic immediately if any of the following apply:

  • β€’ You smell fuel, burning insulation, or see smoke.
  • β€’ Brakes feel soft, pull hard to one side, or make grinding noises.
  • β€’ The engine overheats, stalls repeatedly, or misfires under load.
  • β€’ You are missing required tools, torque specs, or safe lifting equipment.
  • β€’ You are not confident in the next step or safety outcome.