1987 Porsche 928 AutomaticFACTORY OEM SERVICE PROCEDURE

EZF Ignition Control Unit Power Supply Test

  1. Disconnect EZF ignition control unit. Connect voltmeter on terminals No. 12 and 25 of connector. See Fig 1. Turn ignition on. Voltmeter should indicate battery voltage.
  2. If battery voltage is not present, turn ignition off and connect voltmeter between ground and terminal No. W14 of fuse panel/relay block (DO NOT  disconnect connector). Turn ignition on. Voltmeter should indicate battery voltage.
    Fig 1: EZF Ignition Control Unit & Fuse Panel/Relay Block Connectors
    G34181
  3. If battery voltage is not present, pull out the "XVI" (ignition) relay and jumper terminals No. 30 and 87 at the block. See Fig 2. Connect voltmeter as in step 1). Voltmeter should indicate battery voltage.
  4. Connect voltmeter to terminal No. 11 of fuse panel/relay block (DO NOT  disconnect connector). Turn ignition on. Voltmeter should indicate battery voltage.
Fig 2: Fuse Panel/Relay Block
G34182
Factory Service Tools

Use the Manual With the Right Hardware

Pair factory procedures with proven DIY tools so the instructions are easier to execute.

Disclosure: Verified tool recommendations may earn an affiliate commission at no cost to you.

When to See a Mechanic

Stop DIY work and contact a certified mechanic immediately if any of the following apply:

  • • You smell fuel, burning insulation, or see smoke.
  • • Brakes feel soft, pull hard to one side, or make grinding noises.
  • • The engine overheats, stalls repeatedly, or misfires under load.
  • • You are missing required tools, torque specs, or safe lifting equipment.
  • • You are not confident in the next step or safety outcome.