2005 Pontiac G6 BaseFACTORY OEM SERVICE PROCEDURE

Installation Procedure

    Fig 1: Removing 4 EBCM-To-BPMV Retaining Bolts
    GM1234791Courtesy of GENERAL MOTORS CORP.
  1. Clean the sealing surface of the BPMV with denatured alcohol and a clean shop cloth.
  2. Use care when aligning the EBCM to the BPMV electrical terminals. Install the EBCM to the BPMV.
  3. Fig 2: Installing 4 EBCM-to-BPMV Retaining Bolts
    GM1235278Courtesy of GENERAL MOTORS CORP.
Factory Service Tools

Use the Manual With the Right Hardware

Pair factory procedures with proven DIY tools so the instructions are easier to execute.

Disclosure: Verified tool recommendations may earn an affiliate commission at no cost to you.

When to See a Mechanic

Stop DIY work and contact a certified mechanic immediately if any of the following apply:

  • β€’ You smell fuel, burning insulation, or see smoke.
  • β€’ Brakes feel soft, pull hard to one side, or make grinding noises.
  • β€’ The engine overheats, stalls repeatedly, or misfires under load.
  • β€’ You are missing required tools, torque specs, or safe lifting equipment.
  • β€’ You are not confident in the next step or safety outcome.