2002 Pontiac Aztek AWDFACTORY OEM SERVICE PROCEDURE

Installation Procedure

WARNING: This page is about a different car, the 2002 Pontiac Grand Prix. However, it is still accessible from the selected car via links, so may be relevant.
  1. Connect the electrical connectors to the DRL module.
  2. Position the DRL module to the BCM bracket, then slide the module downward to secure the module tabs into the retaining slots on the bracket.
  3. Install the left IP insulator. Refer to CLOSEOUT/INSULATOR PANEL REPLACEMENT -- LEFT .
    Fig 1: DRL & Electrical Connectors
    G01616097Courtesy of GENERAL MOTORS CORP.
Factory Service Tools

Use the Manual With the Right Hardware

Pair factory procedures with proven DIY tools so the instructions are easier to execute.

Disclosure: Verified tool recommendations may earn an affiliate commission at no cost to you.

When to See a Mechanic

Stop DIY work and contact a certified mechanic immediately if any of the following apply:

  • β€’ You smell fuel, burning insulation, or see smoke.
  • β€’ Brakes feel soft, pull hard to one side, or make grinding noises.
  • β€’ The engine overheats, stalls repeatedly, or misfires under load.
  • β€’ You are missing required tools, torque specs, or safe lifting equipment.
  • β€’ You are not confident in the next step or safety outcome.