2002 Pontiac Aztek AWDFACTORY OEM SERVICE PROCEDURE

Installation Procedure

Fig 1: Installing Battery Positive Cable To Vehicle
G01745890Courtesy of GENERAL MOTORS CORP.
  1. Install the battery positive cable to the vehicle.
  2. Raise the vehicle. Refer to LIFTING AND JACKING THE VEHICLE .
    NOTE: Refer to FASTENER NOTICE .
  3. Install the battery positive cable and nut to the starter motor BAT terminal.

    Tighten

    Tighten the nut to 10 N.m (89 lb in).

  4. Install the battery positive cable to the conduit.
  5. Install the battery cable conduit to the conduit retainers.
    Fig 2: Installing Battery Positive Cable To Battery
    G01745891Courtesy of GENERAL MOTORS CORP.
  6. Install the lower radiator baffle. Refer to RADIATOR AIR BAFFLE ASSEMBLIES AND DEFLECTORS .
  7. Lower the vehicle.
  8. Connect the battery positive cable to the generator. Refer to GENERATOR .
  9. Install the battery positive cable and nut to the underhood electrical center.

    Tighten 

    Tighten the nut to 10 N.m (89 lb in).

  10. Install the battery positive cable and bolt to the battery.

    Tighten 

    Tighten the bolt to 16 N.m (12 lb ft).

  11. Install the battery ground (negative) cable to the battery. Refer to Battery Negative Cable Disconnect/Connect Procedure  .
Factory Service Tools

Use the Manual With the Right Hardware

Pair factory procedures with proven DIY tools so the instructions are easier to execute.

Disclosure: Verified tool recommendations may earn an affiliate commission at no cost to you.

When to See a Mechanic

Stop DIY work and contact a certified mechanic immediately if any of the following apply:

  • • You smell fuel, burning insulation, or see smoke.
  • • Brakes feel soft, pull hard to one side, or make grinding noises.
  • • The engine overheats, stalls repeatedly, or misfires under load.
  • • You are missing required tools, torque specs, or safe lifting equipment.
  • • You are not confident in the next step or safety outcome.