2000 Plymouth Neon High Line, AutomaticFACTORY OEM SERVICE PROCEDURE

Concorde, Intrepid, LHS & 300M

Loosen lateral link jam nuts. Rotate adjustment as required to specification. Ensure lateral link does not exceed maximum lengths. See LATERAL LINK MAXIMUM DIMENSIONSΒ  table. Tighten jam nuts to specification. See TORQUE SPECIFICATIONSΒ .

Factory Service Tools

Use the Manual With the Right Hardware

Pair factory procedures with proven DIY tools so the instructions are easier to execute.

Disclosure: Verified tool recommendations may earn an affiliate commission at no cost to you.

When to See a Mechanic

Stop DIY work and contact a certified mechanic immediately if any of the following apply:

  • β€’ You smell fuel, burning insulation, or see smoke.
  • β€’ Brakes feel soft, pull hard to one side, or make grinding noises.
  • β€’ The engine overheats, stalls repeatedly, or misfires under load.
  • β€’ You are missing required tools, torque specs, or safe lifting equipment.
  • β€’ You are not confident in the next step or safety outcome.