1990 Plymouth Laser Base, AutomaticFACTORY OEM SERVICE PROCEDURE

Power Transistor (2.0L) Test

  1. Using an ohmmeter, connect ohmmeter leads between power transistor terminals No. 1 and 3. Using a 1.5-volt dry cell battery, connect positive battery lead to power transistor terminal No. 2 and negative lead to terminal No. 3. Perform TEST 1. See Fig 1 .
  2. When dry cell battery is connected, ohmmeter should read continuity and when disconnected no continuity.
  3. Connect ohmmeter between power transistor terminals No. 6 and 3. Using a 1.5-volt dry cell battery, connect positive battery lead to power transistor terminal No. 5 and negative lead to terminal No. 3. Perform TEST 2. See Fig 1 . When dry cell battery is connected, ohmmeter should read continuity and no continuity when disconnected.
  4. Replace power transistor if it does not test as described.
Fig 1: Testing Power Transistor (2.0L)
G90I06317Courtesy of CHRYSLER MOTORS.
Factory Service Tools

Use the Manual With the Right Hardware

Pair factory procedures with proven DIY tools so the instructions are easier to execute.

Disclosure: Verified tool recommendations may earn an affiliate commission at no cost to you.

When to See a Mechanic

Stop DIY work and contact a certified mechanic immediately if any of the following apply:

  • β€’ You smell fuel, burning insulation, or see smoke.
  • β€’ Brakes feel soft, pull hard to one side, or make grinding noises.
  • β€’ The engine overheats, stalls repeatedly, or misfires under load.
  • β€’ You are missing required tools, torque specs, or safe lifting equipment.
  • β€’ You are not confident in the next step or safety outcome.

Rather have a pro handle this?

A certified mobile mechanic comes to your home or office. They bring the tools, you stay comfortable. No tow truck, no waiting room, no surprises.

Comes to youSame-day available12-month warranty
Get a Free Quote

No obligation. See pricing before you book.