1981 Plymouth Sapporo Automatic TransFACTORY OEM SERVICE PROCEDURE

System Test

  1. Remove switch from instrument panel with wiring still connected. Turn ignition "ON". Check for voltage at terminals B and I. Both should have 10 to 14 volts present. Terminal L should indicate 0 volts. If L shows voltage, check to be sure switch is "OFF". If it is, replace switch.
  2. Move switch to "ON" position. Voltage should be present at terminal "L" for about 10 minutes and indicator light should be on. If light is off, check bulb. If no voltage present at terminal "L", replace switch.
  3. If system still does not operate, check leads and grid lines at rear window. Turn ignition and control switches on; attach a voltmeter between points "A" and "B" (SeeΒ Figure). Voltage reading should be 10-14 volts, if lower, check ground connections. With voltmeter connected at "B", measure grid voltages at midpoint "C". Voltage should be approximately six volts, a reading of zero volts indicates a break between point "A" and midpoint "C". A reading of 12-13 volts indicates a break between midpoint "C" and "B".
Factory Service Tools

Use the Manual With the Right Hardware

Pair factory procedures with proven DIY tools so the instructions are easier to execute.

Disclosure: Verified tool recommendations may earn an affiliate commission at no cost to you.

When to See a Mechanic

Stop DIY work and contact a certified mechanic immediately if any of the following apply:

  • β€’ You smell fuel, burning insulation, or see smoke.
  • β€’ Brakes feel soft, pull hard to one side, or make grinding noises.
  • β€’ The engine overheats, stalls repeatedly, or misfires under load.
  • β€’ You are missing required tools, torque specs, or safe lifting equipment.
  • β€’ You are not confident in the next step or safety outcome.