1978 Plymouth Arrow Base, Automatic TransFACTORY OEM SERVICE PROCEDURE

Jet Valve

  1. Before performing jet valve adjustment, cylinder head bolts must be retightened (cold) to 65-72 ft. lbs. (88-98 N.m). After engine is at normal operating temperature, stop engine, remove rocker cover, and position appropriate piston at TDC.
  2. Fig 1: Mixture Control Valve System (1977)
    G09313047Courtesy of CHRYSLER GROUP, LLC
  3. Back off intake valve side adjusting screw 2 or more turns. Jet valve clearance should be adjusted with intake valve adjusting screw fully loosened. Loosen lock nut on jet valve adjusting screw.
  4. Back off jet valve adjusting screw (counterclockwise) and place 0.006" (0.15 mm) feeler gauge between top end of jet valve stem and bottom end of adjusting screw. SeeΒ Fig 2.
  5. Turn down adjusting screw (clockwise) until proper clearance is obtained. Hold adjusting screw and tighten lock nut. Recheck clearance. Adjust intake valve clearance to 0.006" (0.15 mm). Repeat adjustment at each cylinder.
    Fig 2: Adjusting Jet Valve Clearance
    G09313048Courtesy of CHRYSLER GROUP, LLC
Factory Service Tools

Use the Manual With the Right Hardware

Pair factory procedures with proven DIY tools so the instructions are easier to execute.

Disclosure: Verified tool recommendations may earn an affiliate commission at no cost to you.

When to See a Mechanic

Stop DIY work and contact a certified mechanic immediately if any of the following apply:

  • β€’ You smell fuel, burning insulation, or see smoke.
  • β€’ Brakes feel soft, pull hard to one side, or make grinding noises.
  • β€’ The engine overheats, stalls repeatedly, or misfires under load.
  • β€’ You are missing required tools, torque specs, or safe lifting equipment.
  • β€’ You are not confident in the next step or safety outcome.