1982 Peugeot 504 Automatic TransFACTORY OEM SERVICE PROCEDURE

Load Sensors

  1. Disconnect connector between load sensor and ECB. Connect voltmeter to ground and female terminal (wire 113 or 115) or connector half leading to ECB.
    Fig 1: Diesel EGR Electrical Components & Wires
    G09323287Courtesy of PEUGEOT MOTORS OF AMERICA, INC.
  2. Voltage should be 8 volts or more. If less than 8 volts, check wire 113 or 115 for shorts. Partially connect connector pins between load sensor and ECB.
    NOTE: Load sensor connectors are next to injection pump and are covered by a piece of tubing.
  3. Expose connector pins, but do not break electrical contact. Connect voltmeter to ground and to exposed connector pin on wire 112 or 114. Move swing arm until load sensor is covered by target area. See Figure.
  4. Voltmeter should read 5 volts or more. Move swing arm until load sensor is uncovered by target area. Voltmeter should read 2 volts or less.
  5. If the voltages in step  4) are zero or about equal, connect voltmeter to ground and to exposed connector pin on wire 113 or 115.
  6. Voltage reading should be 8 volts or more. If not, replace load sensor and adjust relative position of sensor to target area. See Load Sensor Adjustment. 
Factory Service Tools

Use the Manual With the Right Hardware

Pair factory procedures with proven DIY tools so the instructions are easier to execute.

Disclosure: Verified tool recommendations may earn an affiliate commission at no cost to you.

When to See a Mechanic

Stop DIY work and contact a certified mechanic immediately if any of the following apply:

  • • You smell fuel, burning insulation, or see smoke.
  • • Brakes feel soft, pull hard to one side, or make grinding noises.
  • • The engine overheats, stalls repeatedly, or misfires under load.
  • • You are missing required tools, torque specs, or safe lifting equipment.
  • • You are not confident in the next step or safety outcome.