2002 Oldsmobile Intrigue GLFACTORY OEM SERVICE PROCEDURE

Installation Procedure

  1. Install the BCM by pushing the top of the BCM up into the mounting bracket. Then, while holding the BCM up, engage the bottom into the mounting bracket slot.
  2. Connect the BCM electrical connectors.
  3. Install the left IP insulator. Refer to CLOSEOUT/INSULATOR PANEL REPLACEMENT - LEFT .
  4. Connect the battery ground cable. Refer to BATTERY NEGATIVE CABLE DISCONNECT/CONNECT PROCEDURE .
  5. Set up the BCM. Refer to Body Control Module (BCM) Programming/RPO ConfigurationΒ 
    Fig 1: Installing Left Instrument Panel Insulator, BCM & BCM Electrical Connectors
    G01831554Courtesy of GENERAL MOTORS CORP.
Factory Service Tools

Use the Manual With the Right Hardware

Pair factory procedures with proven DIY tools so the instructions are easier to execute.

Disclosure: Verified tool recommendations may earn an affiliate commission at no cost to you.

When to See a Mechanic

Stop DIY work and contact a certified mechanic immediately if any of the following apply:

  • β€’ You smell fuel, burning insulation, or see smoke.
  • β€’ Brakes feel soft, pull hard to one side, or make grinding noises.
  • β€’ The engine overheats, stalls repeatedly, or misfires under load.
  • β€’ You are missing required tools, torque specs, or safe lifting equipment.
  • β€’ You are not confident in the next step or safety outcome.