2011 Nissan-Datsun Sentra SE-RFACTORY OEM SERVICE PROCEDURE

Trunk Opener Request Switch Check

  1. CHECK TRUNK OPENER REQUEST SWITCH

    With CONSULT-III 

    Check trunk opener request switch ("BD/TR REQ SW") in "DATA MONITOR" mode.

    CONSULT-III DESCRIPTION

    Monitor item Condition
    BD/TR REQ SW Trunk opener request switch is pressed: ON
    Trunk opener request switch is released: OFF

    Without CONSULT-III 

    1. Turn ignition switch OFF.
    2. Check voltage between Intelligent Key unit connector M42 terminal 29 and ground.
      VOLTAGE AND CONTINUITY SPECIFICATIONS

      Connector Terminals Condition Voltage (V) (Approx.)
      (+) (-)
      M42 29 Ground Trunk opener request switch is pressed 0
      Trunk opener request switch is released 5
      Fig 1: Checking Voltage Between Intelligent Key Unit Connector M42 Terminal 29 And Ground
      G07140419Courtesy of NISSAN MOTOR CO., U.S.A.

      OK or NG 

      OK: Trunk opener request switch is OK.

      NG: GO TO 2.

  2. CHECK TRUNK OPENER REQUEST SWITCH OPERATION
    1. Turn ignition switch OFF.
    2. Disconnect trunk opener request switch connector.
    3. Check continuity between trunk opener request switch terminals 1 and 2.
      VOLTAGE AND CONTINUITY SPECIFICATIONS

      Component Terminals Condition Continuity
      Trunk opener request switch 1 2 Trunk opener request switch is pressed Yes
      Trunk opener request switch is released No

      OK or NG 

      OK: GO TO 3.

      NG: Replace trunk opener request switch.

      Fig 2: Checking Continuity Between Trunk Opener Request Switch Terminals 1 And 2
      G07140420Courtesy of NISSAN MOTOR CO., U.S.A.
  3. CHECK TRUNK OPENER REQUEST SWITCH GROUND CIRCUIT

    Check continuity between trunk opener request switch harness connector T5 terminal 2 and ground.

    2 - Ground : Continuity should exist. 

    OK or NG 

    OK: GO TO 4.

    NG: Repair or replace trunk opener request switch ground circuit.

    Fig 3: Checking Continuity Between Trunk Opener Request Switch Harness Connector T5 Terminal 2 And Ground
    G07140421Courtesy of NISSAN MOTOR CO., U.S.A.
  4. CHECK TRUNK OPENER REQUEST SWITCH CIRCUIT
    1. Disconnect Intelligent Key unit connector.
    2. Check continuity between Intelligent Key unit harness connector M42 (A) terminal 29 and trunk opener request switch harness connector T5 (B) terminal 1.

      29 - 1 : Continuity should exist. 

    3. Check continuity between Intelligent Key unit harness connector M42 (A) terminal 29 and ground.

      29 - Ground : Continuity should not exist. 

      Fig 4: Checking Continuity Between Intelligent Key Unit Harness Connector Terminals And Ground
      G07140422Courtesy of NISSAN MOTOR CO., U.S.A.

      OK or NG 

      OK: GO TO 5.

      NG: Repair or replace harness between Intelligent Key unit and trunk opener request switch.

  5. CHECK TRUNK OPENER REQUEST SWITCH SIGNAL
    1. Connect Intelligent Key Unit connector.
    2. Check voltage between trunk opener request switch harness connector T5 terminal 1 and ground.

      1 - Ground : Battery voltage 

      Fig 5: Checking Voltage Between Trunk Opener Request Switch Harness Connector T5 Terminal 1 And Ground
      G07140423Courtesy of NISSAN MOTOR CO., U.S.A.

      OK or NG 

      OK: Check condition of harness and connector.

      NG: Replace Intelligent Key unit. Refer to "REMOVAL AND INSTALLATION OF INTELLIGENT KEY UNIT ".

Factory Service Tools

Use the Manual With the Right Hardware

Pair factory procedures with proven DIY tools so the instructions are easier to execute.

Disclosure: Verified tool recommendations may earn an affiliate commission at no cost to you.

When to See a Mechanic

Stop DIY work and contact a certified mechanic immediately if any of the following apply:

  • • You smell fuel, burning insulation, or see smoke.
  • • Brakes feel soft, pull hard to one side, or make grinding noises.
  • • The engine overheats, stalls repeatedly, or misfires under load.
  • • You are missing required tools, torque specs, or safe lifting equipment.
  • • You are not confident in the next step or safety outcome.