2011 Nissan-Datsun Maxima SFACTORY OEM SERVICE PROCEDURE

Component Function Check

Regarding Wiring Diagram information, refer to "WIRING DIAGRAM-ENGINE CONTROL SYSTEM- ".

  1. INSPECTION START

    Turn ignition switch OFF, and restart engine.

    Does the engine start? 

    YES-1 >> With CONSULT-III: GO TO 2.

    YES-2 >> Without CONSULT-III: GO TO  3.

    NO >> Go to "DIAGNOSIS PROCEDURE ".

  2. CHECK IGNITION SIGNAL FUNCTION

    With CONSULT-III 

    1. Perform "POWER BALANCE" in "ACTIVE TEST" mode with CONSULT-III.
    2. Check that each circuit produces a momentary engine speed drop.

      Is the inspection result normal? 

      YES >> INSPECTION END

      NO >> Go to "DIAGNOSIS PROCEDURE ".

  3. CHECK IGNITION SIGNAL FUNCTION

    Without CONSULT-III 

    1. Let engine idle.
    2. Read the voltage signal between ECM harness connectors.
      VOLTAGE REFERENCE CHART

      ECM Voltage signal
      + -
      Connector Terminal Connector Terminal
      F14 9 E10 112
      G04886600Courtesy of NISSAN MOTOR CO., U.S.A.
      10
      11
      18
      19
      21
      Fig 1: Checking Voltage Signal Between ECM Harness Connectors
      G05868764Courtesy of NISSAN MOTOR CO., U.S.A.
Factory Service Tools

Use the Manual With the Right Hardware

Pair factory procedures with proven DIY tools so the instructions are easier to execute.

Disclosure: Verified tool recommendations may earn an affiliate commission at no cost to you.

When to See a Mechanic

Stop DIY work and contact a certified mechanic immediately if any of the following apply:

  • • You smell fuel, burning insulation, or see smoke.
  • • Brakes feel soft, pull hard to one side, or make grinding noises.
  • • The engine overheats, stalls repeatedly, or misfires under load.
  • • You are missing required tools, torque specs, or safe lifting equipment.
  • • You are not confident in the next step or safety outcome.